---
title: "About"
---

# About

## About me

![About me](https://www.ifs-erp.com/images/AboutMe/About_Me.webp)

Available for IFS Cloud 25R2 Projects 
# Dariusz Myśliwiec

 
## IFS Cloud Consultant | SCM Architect | Migration Lead

 Helping businesses in **Poland, Europe, and Globally** transform their nervous system. Over 25 years bridging the gap between **Supply Chain Strategy** and **Technical Execution**.

 [Contact Expert](#contact) [View Project History](#experience)

 DM

 ## Why Hire a Hybrid Consultant?

 Most implementations fail because of the disconnect between Business Logic and IT. I speak both languages fluently.

 #### Functional Mastery

 Deep expertise in **Supply Chain (SCM)**, Procurement, Inventory, Distribution, and Manufacturing integrations. I don't just configure; I optimize processes.

 #### Technical Core

 A developer at heart. Expert in **Data Migration Manager (DMM)**, FndMig, Oracle PL/SQL, and complex Crystal Reports. I handle the data others are afraid to touch.

 #### Project Governance

 **PRINCE2® 7 & Agile Certified**. I bring structure to chaos, managing backlogs, roadmaps, and stakeholder expectations for seamless go-lives.

 ## 25+ years in ERP and supply chain - 18+ of them hands-on with the IFS platform (Apps 7.5–10 and IFS Cloud).

 From WMS systems in the 2000s to IFS Cloud 25R2 today.

 ### Current & Recent Engagements

 ##### Fugro & LGC Limited

 2023 - Present

 Global / Remote (via Hoist Global)

 **Roles:** Data Migration Lead & SCM Consultant

 
- Led Data Migration strategy for Fugro's global rollout (IFS Cloud 24R2) using DMM & FndMig.
- Defined Roles & Authorizations security matrix for LGC Limited's upgrade to IFS Cloud 23R1.

 ##### BVI Medical

 2021 - 2023

 Multinational / Remote

 **Role:** IFS Business Systems Analyst (SCM)

 
- Consolidated legacy data (IFS 7.5, PMI, Sage) into IFS Apps 10.
- Ensured integrity of master and transactional data for the SCM module go-live.

 ##### Betafence (PRÆSIDIAD Group)

 2021

 **Role:** IFS Application Functional Lead - SCM

 
- Led IFS SCM™ implementation: process mapping, customization, and reporting.
- Utilized Oracle PL/SQL for data cleansing and formatting.

 ### Historical Achievements

 ###### InfoConsulting Projects

 2013 - 2017

 Delivered functional consulting and technical customizations for major Polish enterprises:

 
- **Oleofarm:** New SCM implementation (App 9).
- **RADPOL S.A.:** WMS integration, Custom Events, Quick Reports (App 8).
- **ATLAS Sp. z o.o.:** Complex Crystal Reports connecting Finance & SCM.

 ###### IFS Poland & Early Career

 2000 - 2013

 Foundational experience with IFS Poland and Quantum Software:

 
- **Barlinek S.A.:** Integrated SCM with Manufacturing & MES (18 months).
- **NGK Ceramics:** Developed Radio Frequency (RF) Warehouse solutions.
- **Newag S.A.:** RF scanning for maintenance and logistics.

 ##### Technical Stack

 IFS Cloud IFS App 7.5 - 10 Data Migration Manager Oracle PL/SQL Crystal Reports WMS / RF Scanning JIRA / DevOps

 ## Frequently Asked Questions

 ## 

 **Yes.** While based in Kraków, Poland, I have extensive experience working remotely for multinational clients like Fugro, LGC Limited, and BVI Medical. I am accustomed to working across time zones and managing international rollouts.

 ## 

 Absolutely. I am an expert in **Data Migration** using both the legacy FndMig tool and the modern **IFS Data Migration Manager (DMM)**. My track record includes migrating critical data from systems like Sage, PMI, and older IFS versions (2003, 7.5, 9), ensuring data integrity for SCM and Finance modules.

 ## 

 I specialize in **Supply Chain Management (SCM)**, including Procurement, Inventory, Warehouse Management (WMS), and Distribution. However, as a "hybrid" consultant, I also possess deep technical skills in PL/SQL, Report Designer, and Crystal Reports, allowing me to build the solutions I design.

 ## 

 Yes. I hold the **IFS Certified Associate Consultant** certification (Apps 9, 10, Cloud). Additionally, I am certified in **PRINCE2® 7 Foundation** and **PRINCE2 Agile® Foundation**, ensuring strict adherence to project management best practices.

  

 ## Ready to Upgrade Your Business Nervous System?

 Contact me for specialized IFS Cloud consultancy, data migration, and process optimization.

 [Email Dariusz](mailto:dariusz.mysliwiec@ifs-erp.consulting)

 [Connect on LinkedIn](https://www.linkedin.com/in/darekmysliwiec/)

 **IFS-ERP Dariusz Myśliwiec** | Kraków, Poland | Mobile: +48 519 460 428


[Read more...](https://www.ifs-erp.com/about/about-me.md)

## About

Established 2021 
## About IFS-ERP Dariusz Mysliwiec

 Pragmatic expertise for the Evergreen era. We turn complex supply chains and high-risk migrations into dependable engines for growth.

 
---

 Led by **Dariusz Myśliwiec**, IFS-ERP Consulting focuses on one clear mission: ensuring your IFS Cloud implementation is delivered on time, on budget, and fully audit-ready. We bridge the gap between abstract software capabilities and the messy reality of manufacturing and logistics.

 ## The Practice

 With over **17 years of hands-on experience**, our practice specializes in stabilizing volatile environments. We do not just configure software; we re-engineer processes to fit the "IFS Way" while respecting your unique business constraints.

  

 
##### Supply Chain Mastery

 Deep expertise in turning tangled logistics flows into streamlined, traceable operations within IFS Cloud.

  

 
##### High-Risk Migration

 Proven methodologies for consolidating multiple legacy systems into a single, clean IFS dataset.

  

 
##### Governance & Security

 Designing "Audit-Ready" permission sets (RBAC) and data governance frameworks from day one.

  

 
##### End-to-End Delivery

 From process analysis and solution design to technical CRIMs, training, and post-go-live support.

 
## Our Philosophy

 
> "The goal is simple: make your ERP a dependable engine for growth, not a source of risk. We focus on real outcomes—not just software."

 Connect on Professional Network

 [Dariusz Mysliwiec](https://pl.linkedin.com/in/darekmysliwiec?trk=profile-badge)

 ### Technical Core

 
- ✓ IFS Applications 9/10 & IFS Cloud
- ✓ Oracle PL/SQL & API Integrations
- ✓ Crystal Reports & Operational Reporting
- ✓ PRINCE2® 7th Edition Foundation


[Read more...](https://www.ifs-erp.com/about/about.md)

