---
title: "SCM Exception Scan for IFS Cloud"
date: 2026-09-11
description: "A five-day, read-only scan that shows the purchasing exceptions already sitting in your IFS Cloud. No emails, no trace in IFS."
author: "Dariusz Mysliwiec"
intro_image: "https://www.ifs-erp.com/images/SCM%20Exception%20Scan%20Cover-selection.webp"
fulltext_image: "https://www.ifs-erp.com/images/SCM%20Exception%20Scan%20Cover-selection.webp"
categories:
  - name: "Applications"
    url: "https://www.ifs-erp.com/applications.md"
---

# SCM Exception Scan for IFS Cloud

![SCM Exception Scan for IFS Cloud](https://www.ifs-erp.com/images/SCM%20Exception%20Scan%20Cover-selection.webp)

IFS Cloud · Purchasing & Inventory

 
## SCM Exception Scan

 A five-day, read-only scan that shows the exceptions already sitting in your own IFS Cloud data: unconfirmed purchase orders, past-due deliveries, stock below minimum. No emails leave the system, and nothing is installed in IFS. You see what to watch before you pay for a full implementation.

 Fixed 900 EUR, credited against the Pack   Read-only · nothing installed in IFS

 
- Five business days, read-only over standard OData
- A short report: the exceptions found, ranked by how actionable they are
- Observation mode: zero notifications, zero trace in IFS
- Fee credited in full against the SCM Automation Pack within 90 days

 [Book a 30-minute fit call](https://www.ifs-erp.com/en/contact) [See pricing](#pricing)

 18 Years on IFS

 5 days To a report

 100% Read-only

 0 Emails in observation week

  ## 1.What it does for you

 Your IFS Cloud already holds every one of these records, correct and current. The scan reads them the same way the monitoring service does, but only to show you the list, never to send anything.

 
- Purchase orders in Released with no supplier confirmation after N days
- Delivery dates passed with no receipt posted
- Stock below its minimum

 The output is a decision list, not a data dump: the exceptions found, how many are actionable, and which of them you would want to monitor automatically. It is the same week of observation the SCM Automation Pack begins with, offered on its own so you can see your own data first.

  ## 2.What you get

 - **Read-only scan** of your live data, in observation mode, with zero notifications
- **A short report:** the exceptions found, ranked by how actionable they are
- **A watch list:** which of these you would want to monitor automatically
- **A 30-minute walkthrough** of the findings with your team

 **Not included:** implementation, ongoing monitoring, process redesign. Those are the SCM Automation Pack, and they are the natural next step.

  ## 3.How it works

 1. **Scoping call (30 min).** We confirm your modules, IFS version and the pain worth solving first.
2. **Read-only account.** Your administrator creates an OData integration account with read access only. Fifteen minutes of work.
3. **Observation week (5 business days).** The rules run in dry-run. Zero emails leave the system.
4. **Handover.** A short report plus a 30-minute walkthrough. You decide what to keep.

  ## 4.Pricing

 | Item | Scope | Price |
| --- | --- | --- |
| Exception Scan | Read-only scan, report and 30-minute walkthrough | **€900** |

 Fixed price. The fee is credited in full against the SCM Automation Pack implementation (€1,800) within 90 days, so the scan costs you nothing if you go on to automate.

  ## 5.Risk reversal

 **The worst case:** if the scan finds nothing worth acting on, the report says so in writing, and you keep it as evidence that your exceptions are under control. You have spent €900 to retire a question that was otherwise sitting unanswered.

  ## 6.Frequently asked questions

 Do you need write access to our IFS? No. The scan uses a read-only OData integration account and standard projections. Nothing is installed in IFS, nothing is written back, and there is nothing to uninstall when the scan finishes.

   Will the scan send anything to suppliers or buyers? No. The scan runs entirely in observation mode. Zero notifications leave the system. You read the list and decide what you want to be told about, long before anyone is emailed.

   What do I need to provide? Three things. A read-only IFS Cloud integration account with access to the relevant SCM projections; your administrator creates it in about fifteen minutes. A place to run the scan container inside your own infrastructure: a small VM or a Docker host. And network reach from that container to IFS over HTTPS. The scan runs in your network, not on our servers.

   How does the scan relate to the SCM Automation Pack? The scan is the same week of observation the Pack begins with, offered on its own. The fee is credited in full against the Pack implementation within 90 days, so choosing to automate afterwards costs you nothing extra.

  ## 7.About the author

 **Dariusz Myśliwiec**: 18 years of hands-on IFS practice (Apps 7.5–10 and IFS Cloud). IFS Certified Associate Consultant. PRINCE2® 7. Independent practice based in Kraków, delivered remotely across Europe and globally. You talk to the consultant who builds it, not a sales layer.

 **Selected clients:** Fugro · LGC · BVI Medical · Betafence (PRÆSIDIAD) · Barlinek · NGK Ceramics · Newag · Oleofarm.

 IFS is a registered trademark of IFS AB; this practice is not affiliated with IFS AB.

  ## See your own exceptions before you pay for anything

 Book a 30-minute fit call. You will see which exceptions are sitting in your own data, which three to watch first, and a fixed price for the scan.

 [Book a 30-minute fit call](https://www.ifs-erp.com/en/contact)
