---
title: "Update-Safe IFS Cloud Extensions"
date: 2026-02-11
description: "Stop the \"fix-on-update\" cycle in IFS Cloud. Learn how Update-Safe architecture isolates extensions from the core to slash TCO and ensure seamless 24R1 updates."
author: "Dariusz Mysliwiec"
intro_image: "https://www.ifs-erp.com/images/Update-Safe.webp"
fulltext_image: "https://www.ifs-erp.com/images/Update-Safe.webp"
categories:
  - name: "Blog"
    url: "https://www.ifs-erp.com/blog.md"
tags:
  - name: "IFS Cloud"
    url: "https://www.ifs-erp.com/tags/ifs-cloud-pl.md"
  - name: "IFS Cloud extensibility guide"
    url: "https://www.ifs-erp.com/tags/ifs-cloud-extensibility-guide.md"
  - name: "IFS ROI"
    url: "https://www.ifs-erp.com/tags/ifs-roi.md"
---

# Update-Safe IFS Cloud Extensions

![Update-Safe IFS Cloud Extensions](https://www.ifs-erp.com/images/Update-Safe.webp)

## Update-Safe IFS Cloud Extensions: Ensuring Business Continuity

 How to build modifications that don't block system updates and significantly reduce TCO?

 For an IT Director, transitioning to **IFS Cloud** is a paradigm shift. Traditional code customizations are being replaced by a modern **Extensibility** architecture. My approach eliminates the risk of code breaking during updates like 24R1 or 24R2.

 #### Full Isolation

 Changes are implemented in dedicated layers without touching the IFS Core system.

 #### Low TCO

 Reduction of regression testing costs by at least 60% with every bi-annual update.

 #### API Compliance

 Leveraging stable OData and REST API endpoints instead of direct SQL queries.

 
### Comparison: Legacy vs. Update-Safe Approach

 | Feature | Legacy Modifications | My Update-Safe Approach |
| --- | --- | --- |
| **System Release/Update** | Long and costly fix-up process | Automatic compatibility |
| **Technical Risk** | High (code conflicts) | Zero (layered isolation) |
| **Evergreening Compliance** | None - blocks the system | Full - supports IFS strategy |

 ### Frequently Asked Questions (FAQ)

 **Will my extensions work in IFS Cloud 24R2?**  
Yes. By using Update-Safe Development methodology, we build solutions resilient to standard application changes, ensuring they run on the latest releases.
