Skip to main contentSkip to footer

Configuration

Configuration in IFS Cloud means shaping the system through supported settings, data and tools, without writing code that has to be carried through every release update. It is the central lever of a clean implementation, and the tag gathers material on where configuration is enough and where it is not.

Configuration, customization, extension

The three words are often mixed up in project meetings. Configuration is a change of setup data, such as parameters, workflows, approval rules and permission sets. Customization is a modification of how the application behaves or looks, beyond what setup allows. Extension is a separate piece of logic built on supported interfaces. Each step to the right adds a cost that returns at every release update in the form of testing and rework, which is why the order of preference is clear.

Subjects collected here

  • Fit to standard - running the design phase as a comparison of business needs against the standard process, so that gaps are few and justified.
  • Environments - how many environments a project needs, what each is for and how and when they are refreshed from production.
  • Configure to order - using configured products and rules in place of a growing number of static bills of materials.
  • Workflows - automating routing and notification inside the standard functionality.
  • Cost of customization - what every modification adds at each release update.

A test for every request

When a key user asks for a change, ask three questions. Can an existing setting deliver it? Does the standard process already cover the need under a different name? If code is unavoidable, can it be kept outside the application, using only supported interfaces? An honest answer at this stage keeps the system upgradeable.

The articles under this tag apply that discipline to concrete situations.

Record what you decided

Every deviation from standard should be entered in a register with the reason, the owner and the expected test effort at each release update. After a year that register shows what the customization really costs, and it gives the steering committee a factual basis for deciding what to keep, what to replace with standard functionality and what to retire.

ROI Calculator

Calculate your return on investment

Input Values

€
€
€

Results

Annual Savings
€ 0
Payback Period
0 months
ROI
0%
Monthly Savings
€ 0

Get Detailed Report

Enter your details to receive a detailed ROI report.