Skip to main contentSkip to footer

Configure-to-Order

Configure-to-Order (CTO) is the process in which a customer chooses options for a product and IFS Cloud builds the structure and routing for that specific order. The alternative is a static bill of materials, where every variant exists as its own part number with its own structure. CTO keeps the part master small, but it moves effort into the configuration model, so the setup has to be designed carefully.

Why teams choose CTO over static BOMs

A static BOM works while the number of variants stays small. When options multiply, the part master fills with near-identical parts, every engineering change has to be repeated in many structures, and planners lose track of which variant is really needed. In CTO the options are captured as characteristics on the customer order line, and the order drives what is purchased or manufactured.

Points to settle before go-live

  • Characteristics and rules. Decide which choices the sales user makes and which combinations must be blocked.
  • Supply for configured components. Some components are bought only because a customer chose them, so the purchasing side must be ready to receive that demand.
  • Costing. Price and cost of a configured item must be explainable to finance, not only to engineering.
  • Ownership. Someone must maintain the configuration model after the project team leaves.

Articles under this tag compare CTO with static structures and follow a configured order into purchasing. The question a consultant should ask first is how many real variants the business sells and how often they change. If the answer is a handful that rarely change, a static BOM is often simpler and easier to support. If the answer is many combinations, CTO earns its complexity.

ROI Calculator

Calculate your return on investment

Input Values

€
€
€

Results

Annual Savings
€ 0
Payback Period
0 months
ROI
0%
Monthly Savings
€ 0

Get Detailed Report

Enter your details to receive a detailed ROI report.