Skip to main contentSkip to footer

Custom Fields

Custom Fields are the configuration-layer way to add a data field to an IFS Cloud page without touching delivered code. A field is defined in the Aurena configuration, stored in the customer's own environment and shown on the page where users need it. Because no core object is modified, the field belongs to the update-safe side of the extensibility model.

What articles under this tag cover

Posts tagged Custom Fields look at the practical places where a field gets added, in particular dialog and assistant views, where the user fills in data step by step before a record is created. These views behave differently from a normal page, so a field that works on a list or a card may not appear in a dialog until it is configured for that specific view.

Questions a consultant asks before adding a field

  • Which page and which view? A field is attached to a specific page, and the same business entity can be shown on several pages, each needing its own placement.
  • Where does the value go? A field that must feed reports, filters or integrations needs a clear owner and a defined data type from the first day.
  • Who may see and edit it? Visibility and edit rights should be decided together with the Permission Set design, not left to defaults.
  • Is it mandatory, and at which step? Mandatory logic that fires too early blocks users in an assistant, so the point of validation matters.
  • What happens at the next release? Configuration should be documented and retested after each update, even when it is update-safe by design.

Custom Fields are not a substitute for a proper data model. When the requirement is validation across several records or an automated action, a different part of the extensibility framework, such as Custom Events or a separate projection, is usually the better tool. Use this tag to find articles that show where that boundary lies and how to keep configuration small, named consistently and easy to hand over to the next person who maintains the system.

ROI Calculator

Calculate your return on investment

Input Values

€
€
€

Results

Annual Savings
€ 0
Payback Period
0 months
ROI
0%
Monthly Savings
€ 0

Get Detailed Report

Enter your details to receive a detailed ROI report.