Evergreen
Evergreen is the way IFS delivers IFS Cloud: a continuous stream of updates, not a large upgrade every few years. For a customer it changes the nature of the work. There is no final go-live after which the system is left alone. Instead, the organisation must be able to absorb releases on a regular rhythm for as long as it runs the product.
What this means for a project
The implementation team should plan for the second year while it is still planning the first. Every decision about customisation, integration and data structure leaves a cost that returns with each update. That cost is smaller when the solution stays close to standard and larger when it does not.
The trap
The risk is not the update itself. It is the slow drift that happens when updates are postponed, regression testing is thin and nobody owns the release calendar. The gap to the current release grows, and the eventual catch-up becomes a project of its own. The articles under this tag describe this pattern and how to avoid it.
What a consultant sets up early
- An owner for the release calendar, with authority to schedule testing in the business.
- A regression scope that lists the processes, interfaces and reports that must be checked after each update.
- A register of deviations from standard, so each update has a known test scope.
- Test data and test users that are ready before the release arrives, not assembled in a hurry.
Planning for go-live is part of the same discipline. A cutover that is rushed to meet a date leaves defects that surface when the first update lands on top of them. Articles here connect the project plan with what happens afterwards, so that the programme is judged by how the system behaves a year later and not only on the go-live day.
A practical test of readiness is simple. Ask who would run the next update next week, with which scripts and on whose approval. If the answer takes more than a minute, the Evergreen model has not yet been absorbed by the organisation.