IFS Cloud Distributed Fulfilmen
Distributed fulfilment is the design in which a customer order can be served from several places, such as a central warehouse, a regional site or a supplier, depending on stock and delivery needs. In IFS Cloud this is built from sites, supply codes, inter-site transfers and purchasing, so the architecture is a set of decisions about how these parts work together.
The decisions behind the design
The first decision is where each product should be held. A fast-moving part may be stocked at several sites, while a slow-moving one is better kept centrally. The second is how a customer order selects its source, which is set through supply codes and site settings. The third is how stock moves between sites, for example with a shipment order.
Points to check in an architecture review
- Site structure. Each site should have a clear role, since overlapping roles create confusion in planning.
- Source selection. Rules for choosing a source must be understood by sales support, or exceptions will be handled by hand.
- Transfers. Moves between sites need clear ownership and visibility in transit.
- Purchasing links. When a line is served by a supplier, the demand must reach purchasing without manual re-entry.
- Reporting. Service level and stock should be reportable by site and for the network as a whole.
The article under this tag treats the topic as architecture instead of a feature list. The recurring risk is complexity: each extra source adds rules, and each rule needs an owner. A good design is the simplest network that meets the delivery promise, not the most flexible one that can be configured. Before adding another source or site, write down who will maintain its rules and how its stock will be counted and reported.
