Skip to main contentSkip to footer

IFS ROI

The return on an IFS Cloud project is decided less at go-live than in the years after it, when every release update meets the changes made during implementation. Update-safe extensions are the way to keep that return from eroding, and this tag collects the material about it.

Why customisation shapes ROI

IFS Cloud is updated on a regular release cycle. Anything that sits inside the standard application, such as modified logic or heavily changed pages, must be reviewed and retested with each update. That effort recurs, so it belongs in the business case from the start and not as a surprise in the first upgrade year.

Options in order of risk

  • Configuration through standard setup, Permission Sets, and the personalisation that the framework offers. This stays inside the supported model.
  • Extensibility such as custom fields and custom events, which IFS designed to survive updates, though they still need a check after a release.
  • Reading data through OData or REST projections into reports or external tools, which leaves the IFS Cloud code untouched.
  • Direct changes to standard logic, which carry the highest upgrade burden and should need a strong justification.

When a requirement comes up in a workshop, the useful question is which of these four it can be solved with. A requirement that can be met by a read-only report does not need a modification, and one that needs a modification should carry an estimate of its yearly regression cost.

Articles under this tag explain how to choose between the options, how to document what was changed so a later update has a clear test scope, and how to present the trade-off to a steering group in terms of money and risk rather than technique.

A simple discipline helps here: every request that reaches the project gets a line in the register stating the chosen option, the reason and the person who accepted the upgrade cost. When the next release arrives, that register becomes the regression scope, and the discussion about what must be tested takes an hour instead of a week.

ROI Calculator

Calculate your return on investment

Input Values

€
€
€

Results

Annual Savings
€ 0
Payback Period
0 months
ROI
0%
Monthly Savings
€ 0

Get Detailed Report

Enter your details to receive a detailed ROI report.