Skip to main contentSkip to footer

Inventory Management

Inventory management in IFS Cloud is the control of stock quantity, location, condition and value across sites and warehouses. The articles under this tag focus on exceptions: records that are technically valid but point to a process problem, such as a part that is never counted or an adjustment nobody explained.

Exception categories covered

  • Cycle count gaps. Parts that belong to no cycle count schedule are never verified, so errors accumulate unseen.
  • Slow-moving and obsolete stock. Parts with no movement tie up money, and obsolete parts that still hold quantity distort planning and valuation.
  • Lot and serial tracking. A lot-tracked part with no lot number, or a serial-tracked part missing a serial, breaks traceability that recalls and warranty depend on.
  • Shelf life. Lot expiry dates decide whether stock can be issued, and unmanaged expiry turns into write-offs.
  • Adjustments without a reason. A stock correction with no reason code cannot be analysed later, and it is the first thing an auditor questions.
  • Consignment stock. Supplier-owned stock held at your site needs regular reconciliation, or the two sides disagree on what was consumed.

Why exceptions are the right starting point

Most inventory dashboards show totals. Totals hide the individual record that breaks a process. A list of parts with a specific defect gives a warehouse supervisor a task they can finish, which a general stock accuracy figure does not.

Each article describes what the exception means in IFS Cloud, why it arises, and how to find it with a query on existing data. The approach is read-only: find the record, assign an owner, correct it through the normal screens, and then check that the cause is closed so the same exception does not return next month.

Page 1 of 2

ROI Calculator

Calculate your return on investment

Input Values

€
€
€

Results

Annual Savings
€ 0
Payback Period
0 months
ROI
0%
Monthly Savings
€ 0

Get Detailed Report

Enter your details to receive a detailed ROI report.