Skip to main contentSkip to footer

Testing

Testing in an IFS Cloud project is the evidence that the solution does what the business needs, on the data the business really has, with the people who will use it. It is not a phase at the end. It is a set of activities that begin with the test strategy and continue through acceptance and into the first live weeks.

Layers of testing

  • Unit and configuration checks: the implementer confirms that each setup and each modification works as designed.
  • Integration testing: processes that cross modules and interfaces are run from start to end, for example from requisition to payment.
  • User acceptance: business users run their own scenarios and decide whether the result is acceptable.
  • Operational readiness: support, monitoring, backup and recovery are shown to work for the people who will run the system.
  • Performance and volume: the system is exercised with realistic numbers of users and transactions.

What makes tests worth running

A test script is only useful if it states the starting data, the steps, the expected result and who accepts it. Scripts written by the people who configured the system tend to confirm the design. Scripts written with business users tend to find the gaps. Both are needed, and the defect log must record severity, owner and status so that the decision to proceed rests on facts.

Common weaknesses

Test data is the usual problem. If the test environment holds only a few clean records, problems that depend on real volumes, odd addresses or old transactions stay hidden. Environments that differ from the planned production setup, and users who are too busy to test properly, are the next two. Sign-off without a record of what was tested gives no protection when something fails after go-live.

Articles under this tag explain how to build a test strategy, how to structure acceptance scripts and sign-off, and how testing connects to the readiness decision. Templates are offered as a starting point to adapt to the scale of your project.

ROI Calculator

Calculate your return on investment

Input Values

€
€
€

Results

Annual Savings
€ 0
Payback Period
0 months
ROI
0%
Monthly Savings
€ 0

Get Detailed Report

Enter your details to receive a detailed ROI report.