---
title: "Configurations"
---

# Configurations

## **Tailor IFS Cloud without writing code you'll regret.**

 Every IFS customer hits the same wall: standard functionality gets you 80% of the way, and the last 20% tempts teams into code that breaks at the next upgrade. Our Configurations close that gap the clean way — Page Designer, Business Process Automation and custom events instead of technical debt.

 **What's inside:**

 • Tailor the user experience without coding — Aurena layouts, field rules, defaults.

 • Automate routine workflows with custom events and BPA.

 • Surface role-based KPIs on IFS Lobbies — no external BI needed.

 • Add industry-specific data fields instantly, upgrade-safe by design.

 • Every package respects the Extensibility Framework, so bi-annual upgrades stay clean.


