title: "Data migration"
description: "IFS Cloud 25R2 Data Migration Manager (DMM): governed, staged data loads with validation and visual auto-mapping, replacing custom PL/SQL scripts."
---

# Data migration

Release Update | 25R2 
## Mastering Data Migration in IFS Cloud 25R2

 Leveraging the Smart Data Manager to transform legacy chaos into structured, audit-ready assets.

 
---

 In the 25R2 release, data migration has evolved from a technical "backend task" to a governed business process. With the enhanced **Data Migration Manager (DMM)**, IFS Cloud now offers a standardized, containerized approach to moving data, significantly reducing the reliance on fragile, custom PL/SQL scripts.

 ## The Shift: Smart Data Manager

 The core innovation in 25R2 is the maturity of the **Smart Data Manager**. Unlike legacy migration tools that pushed data directly into production tables, the Smart Data Manager utilizes a strict "Staging" methodology. This ensures that no data enters the core system until it passes rigorous validation rules defined by the business, not just the IT department.

 
### 25R2 Migration Capabilities

  

 
##### 1. Containerized Staging

 25R2 allows you to create isolated "Migration Projects" (Containers). You can load data from Excel, CSV, or external SQL DBs into these containers without affecting the live environment. This allows for iterative testing—you can wipe and reload the container 50 times without creating "junk" in the actual Master Data.

  

 
##### 2. Mapping & Transformation

 The Mapping tool in 25R2 provides a visual interface to map Legacy Fields to IFS Cloud Fields.   
New in 25R2 **Auto-Mapping:** The system uses fuzzy logic to suggest mappings based on column headers, speeding up the initial setup by up to 40%.

  

 
##### 3. Pre-Load Validation

 The system runs "Basic Data" checks before the load. For example, if you try to migrate a Customer Order, the Smart Data Manager verifies that the *Customer ID*, *Sales Part*, and *Currency* already exist in the target environment. If not, the specific line is flagged as "Error" while valid lines proceed.

 ### The "Evergreen" Advantage

 Migration jobs built in 25R2 are persistent. Unlike one-off scripts, these migration containers can be reused for future M&A activities (merging new companies) or bulk-updates, ensuring your investment in data mapping pays dividends long after Go-Live.

 #### Legacy Trap

 Do not attempt to use old IFS Applications 9/10 "FNDMIG" scripts directly in IFS Cloud 25R2. The API structures and REST endpoints have changed. 25R2 requires utilizing the **Deployment Containers** for stability.

 25R2 Readiness Checklist

 
- Define "Source" identifiers.
- Cleanse duplicates in Legacy *before* extraction.
- Validate "Basic Data" (Sites, Currencies) first.
- Run Mock Load in Test Container.

 ## 25R2 Migration FAQs

 ## 

 25R2 utilizes parallel processing within the Data Migration Manager. You can configure "Deployment Sets" to run concurrently (e.g., loading Customers and Suppliers at the same time), significantly reducing the Cutover Weekend window compared to sequential loading.

 ## 

 Yes. The Smart Data Manager has excellent support for Excel ingestion. It can read flat files directly into the staging containers. However, for massive datasets (>500k rows), we recommend connecting directly to a staging SQL database/Data Lake for better performance.

 ## 

 In 25R2, valid records are committed, and invalid records are flagged in a "Feedback" view. You can fix the data directly in the Staging Container (via the UI) and re-process *only the failed lines* without rolling back the entire job.


## Przekazanie danych z IFS Cloud do nowego ERP

![Przekazanie danych z IFS Cloud do nowego ERP](https://www.ifs-erp.com/images/articles/przekazanie-danych-z-ifs-pl-b4430bdc.webp)

Marketplace · Migracja danych z IFS · MIG-EXT-001

 
## Przekazanie danych z IFS

 Migracja Twoich danych z IFS do nowego ERP, z zestawem ekstrakcji jako punktem wejścia: jeden skrypt na obiekt danych, słownik pól zbudowany z Twoich metadanych, zapytania flagujące duplikaty i braki oraz arkusz, który po każdym cyklu uzgadnia cztery liczby i sprawdza, czy filtry uprawnień po cichu nie obcięły wyniku. W pilotażu dostarczam zestaw razem z usługą i uruchamiam ekstrakcję z Twoim zespołem. Dane są tylko odczytywane z bazy źródłowej; nic nie jest zapisywane w IFS.

 Zestaw, punkt wejścia: 2 500 EUR jednorazowo za firmę

 Usługa wyceniana po warsztacie

 
- W pilotażu obejmuje IFS Applications 7.5–10 i IFS Cloud, hostowane u Ciebie lub zarządzane przez IFS
- Dane są tylko odczytywane z bazy źródłowej; nic nie jest zapisywane w IFS
- W pilotażu kryteria selekcji są parametrami, więc każdy przebieg jest powtarzalny
- System docelowy nie ma znaczenia: zestaw daje pliki, mapuje konsultant systemu docelowego

 [Umów 30-minutową rozmowę techniczną](https://www.ifs-erp.com/pl/kontakt) [Cena zestawu i warunki pilotażu](#ph-sec-price)

 ## 1.Dlaczego wyjęcie danych z IFS zatrzymuje projekt nowego ERP?

 Konsultant, który ładuje nowy system ERP, zmapuje tylko to, co rozumie, a baza IFS to lata klientów, dostawców i artykułów, z duplikatami i z polami, których znaczenie istnieje wyłącznie w konfiguracji Twojego IFS. Gdy eksport przychodzi bez tego wyjaśnienia, każdy import próbny zwraca listę pytań, a termin przełączenia się przesuwa. Druga przyczyna jest cicha: widoki IFS filtrują wiersze według firmy i oddziału, więc ekstrakcja może zwrócić mniej wierszy, niż istnieje, bez żadnego komunikatu o błędzie.

  ## 2.Co obejmuje usługa migracji danych z IFS?

 [Usługa migracji danych z IFS](https://www.ifs-erp.com/pl/marketplace-pl/migracja-danych/migracja-danych-z-ifs) zaczyna się od warsztatu zakresu i harmonogramu, a potem przebiega w cyklach: ekstrakcja, konsultacje z Twoimi użytkownikami i z konsultantem systemu docelowego, wsparcie przy czyszczeniu oraz poprawki eksportu po każdym imporcie próbnym. Warsztat jest krokiem 1 usługi i nie ma osobnej ceny. Usługę wyceniam po nim, gdy znane są obiekty danych, kryteria selekcji i harmonogram cykli.

 Mapowanie, transformacja i import zostają po stronie konsultanta systemu docelowego. Przekazanie danych z IFS opiera się na umowie plikowej z usługi: eksporty powtarzają się z tym samym wynikiem, bo selekcja siedzi w parametrach skryptu, a nie w ręcznie edytowanych plikach.

  ## 3.Czym jest zestaw i dlaczego jest punktem wejścia?

 Zestaw Przekazanie danych z IFS to część ekstrakcyjna usługi: skrypty, słownik pól i arkusz uzgodnienia, które dają pliki w stałym formacie, z opisem każdego pola, dla konsultanta ds. migracji w systemie docelowym. Jest punktem wejścia, bo to on jest pierwszym zakupem, a wszystko po ekstrakcji, od czyszczenia po importy próbne, pracuje na plikach, które tworzy. Pasuje do firmy, która przechodzi z IFS na SAP lub inny ERP i ma po stronie systemu docelowego konsultanta, który robi mapowanie i import.

 Zestaw jest w pilotażu: dostarczam go pierwszym klientom razem z usługą i uruchamiam ekstrakcję z Twoim zespołem. Dostajesz skrypty, słownik pól, arkusz uzgodnienia i pliki wynikowe. Nie jest to jeszcze produkt, który kupujesz i uruchamiasz samodzielnie.

  ## 4.Cena zestawu i warunki pilotażu

 | Część | Cena | Rozliczenie |
| --- | --- | --- |
| Zestaw, punkt wejścia | 2 500 EUR jednorazowo za firmę | Cena regularna także dla klientów pilotażowych, bez rabatu |
| Usługa, zaczynająca się od warsztatu zakresu i harmonogramu | Wycena po warsztacie | Warsztat, cykle, konsultacje i wsparcie przy czyszczeniu |

 **Kolejność kroków:** krok 1 to warsztat, który ustala obiekty danych, kryteria selekcji i harmonogram cykli przed napisaniem pierwszego skryptu; krok 2 to ekstrakcja zestawem na tej podstawie. Usługę wyceniam po warsztacie.

 **Dostarczenie:** w pilotażu, razem z usługą; ekstrakcję uruchamiam z Twoim zespołem.

 **Warunek pilotażu:** Twoja zgoda na wskazanie firmy jako referencji po uruchomieniu systemu docelowego. Samodzielny zakup zestawu, bez usługi, otworzy się po pilotażu. Daty na to nie ma.

  ## 5.Jakie wersje IFS i modele hostingu obejmuje zestaw?

 W pilotażu zestaw obejmuje IFS Applications 7.5–10 i IFS Cloud, niezależnie od tego, czy baza jest hostowana przez Twoją firmę, czy system jest zarządzany przez IFS. W każdej konfiguracji dane są tylko odczytywane z bazy źródłowej, a nic nie jest zapisywane w IFS.

 
| Konfiguracja IFS | Hosting |
| --- | --- |
| IFS Applications 7.5–10 | Baza hostowana przez Twoją firmę |
| IFS Cloud | Baza hostowana przez Twoją firmę (Remote) |
| IFS Cloud | Zarządzany przez IFS |

  ## 6.Najważniejsze cechy

 Przekazanie danych z IFS jest dostarczane w pilotażu razem z usługą i ma następujące cechy.

 
- **Najpierw porównanie schematu** - pierwszy przebieg porównuje Twój schemat ze schematem referencyjnym, na którym skrypty powstają i są testowane w pilotażu, więc zmieniona lub przemianowana kolumna wychodzi przed pierwszym eksportem, a nie w systemie docelowym.
- **Jeden skrypt na obiekt danych** - klienci, dostawcy, artykuły, projekty i salda otwarte, z kryterium selekcji (na przykład klienci z zakupem w ostatnich 5 latach) jako parametrem.
- **Słownik pól z Twoich metadanych** - generowany z metadanych Twojej instalacji IFS, więc odzwierciedla Twój system, a nie stałą listę.
- **Zapytania flagujące duplikaty i braki** - reguły dopasowania (nazwa, numer podatkowy, adres) są konfigurowalne, a flagi jadą razem z eksportem, więc użytkownicy trafiają na nie na początku czyszczenia.
- **Arkusz uzgodnienia** - cztery liczby po każdym cyklu: rekordy w IFS wg kryteriów, duplikaty scalone, rekordy wykluczone z uzasadnieniem, rekordy w systemie docelowym po imporcie.
- **Kontrola kompletności** - porównuje liczbę wierszy zwróconą przez ekstrakcję z liczbą z raportu IFS.
- **Lista kontrolna dostępu** - co załatwić, z kim i w jakiej kolejności przed pierwszym uruchomieniem.

  ## 7.Dlaczego zestaw sprawdza kompletność wobec widoków filtrowanych uprawnieniami?

 Widoki IFS filtrują wiersze według firmy i oddziału, więc ekstrakcja może dostać mniej wierszy, niż istnieje, bez żadnego komunikatu o błędzie. Eksport obcięty po cichu psuje od początku pierwszą z czterech liczb uzgodnienia, czyli rekordy w IFS według kryteriów. Kontrola kompletności wykonywana w pilotażu porównuje liczbę zwróconą przez ekstrakcję z liczbą z raportu IFS. Liczby się zgadzają albo różnica jest wyjaśniona, inaczej cykl nie jest zamknięty.

  ## 8.Co jest w zestawie, a czego w nim nie ma?

 Tabela pokazuje, co zawiera Przekazanie danych z IFS dostarczane w pilotażu razem z usługą.

 
| Element | W zestawie | Uwaga |
| --- | --- | --- |
| Krok porównania schematu | Tak | Pierwszy krok każdego użycia zestawu na nowym systemie IFS |
| Skrypty ekstrakcji per obiekt danych | Tak | Klienci, dostawcy, artykuły, projekty, salda otwarte; kryteria selekcji jako parametry |
| Słownik pól | Tak | Generowany z Twoich metadanych, razem z polami własnymi tam, gdzie system je udostępnia |
| Zapytania flagujące duplikaty i braki | Tak | Reguły dopasowania do konfiguracji |
| Arkusz uzgodnienia | Tak | Cztery liczby na cykl oraz kontrola kompletności |
| Lista kontrolna dostępu | Tak | Osobno dla każdej wersji IFS i modelu hostingu |
| Rejestr obiektów, log decyzji, lista kontaktów, harmonogram cykli | Nie | Dokumenty procesowe, patrz [Dokumenty wdrożeniowe](https://www.ifs-erp.com/pl/marketplace-pl/dokumenty-wdrozeniowe) |
| Warsztat zakresu i harmonogramu, konsultacje, czyszczenie z użytkownikami, poprawki eksportu po imporcie próbnym | Nie | Wchodzą w [usługę migracji danych z IFS](https://www.ifs-erp.com/pl/marketplace-pl/migracja-danych/migracja-danych-z-ifs), wycenianą po warsztacie |
| Mapowanie na system docelowy, transformacja, import | Nie | Robi konsultant ds. migracji w systemie docelowym |

  ## 9.Czego potrzebujesz do ekstrakcji?

 - **Dostęp do danych** systemu IFS, z którego migrujesz, załatwiony według listy kontrolnej dostępu.
- **Osoba z IT**, która załatwi dostęp i zatrzyma pliki wynikowe w Twojej firmie.
- **Konsultant ds. migracji w systemie docelowym**, który zmapuje pliki.
- **Użytkownicy biznesowi** ze sprzedaży, finansów i projektów, którzy czyszczą i akceptują dane.

 Dane są tylko odczytywane z bazy źródłowej. Z założenia dane biznesowe trafiają wyłącznie do plików wynikowych w Twojej firmie, nigdy do logów, więc udostępniaj te pliki tylko osobom, które je czyszczą i mapują.

  ## 10.Najczęściej zadawane pytania

 Czy mogę już teraz kupić Przekazanie danych z IFS i uruchomić je samodzielnie? Nie. Przekazanie danych z IFS jest w pilotażu, a zestaw dostarczam klientom pilotażowym razem z usługą, uruchamiając ekstrakcję z zespołem klienta. Samodzielny zakup zestawu otworzy się po pilotażu, a daty na to nie ma.

   Ile płaci klient pilotażowy i co daje w zamian? Klient pilotażowy płaci dwie rzeczy: cenę regularną zestawu Przekazanie danych z IFS, 2 500 EUR jednorazowo za firmę, bez rabatu; oraz usługę (warsztat zakresu i harmonogramu, cykle, konsultacje, wsparcie przy czyszczeniu), którą wyceniam po warsztacie. W zamian klient zgadza się na wskazanie jako referencja po uruchomieniu systemu docelowego.

   Czy Przekazanie danych z IFS działa dla IFS Cloud zarządzanego przez IFS? Tak, w pilotażu. Przekazanie danych z IFS obejmuje IFS Cloud zarządzany przez IFS. Dane są tylko odczytywane z bazy źródłowej; nic nie jest zapisywane w IFS.

   Czy Przekazanie danych z IFS instaluje cokolwiek w IFS? Nie. Dane są tylko odczytywane z bazy źródłowej, nic nie jest zapisywane w IFS ani w nim instalowane, więc Przekazanie danych z IFS nie zostawia obiektów do przejrzenia przy następnej aktualizacji IFS.

   Czy słownik pól obejmuje nasze pola własne? Tam, gdzie system je udostępnia, tak. W pilotażu generuję słownik z metadanych Twojej instalacji IFS, więc obejmuje pola własne, jeśli istnieją: widoki z końcówką `_CFV` i kolumny zaczynające się od `CF$_`, które IFS Applications ma od wersji 8, a IFS Cloud zachowuje. IFS Applications 7.5 nie ma pól własnych.

   Dlaczego nie użyć Data Migration Managera do eksportu z IFS? Data Migration Manager w IFS ładuje dane do IFS, a jego funkcja eksportu przenosi definicje zadań między środowiskami, nie dane biznesowe. Wyjście z IFS wymaga więc osobnej ekstrakcji, którą dostarcza Przekazanie danych z IFS.

   Kto mapuje wyeksportowane pliki na nowy ERP? Konsultant ds. migracji w systemie docelowym. Przekazanie danych z IFS dostarcza stały format pliku z opisanym zestawem pól, a mapowanie na szablony systemu docelowego, transformację i import wykonuje strona docelowa. Konsultant IFS kończy na opisanym pliku.

   Gdzie trafiają dane biznesowe z ekstrakcji? Wyłącznie do plików wynikowych w Twojej firmie. Z założenia Przekazanie danych z IFS nie zapisuje w logach danych biznesowych, takich jak nazwy dostawców, ceny i adresy, a w logach mają być tylko klucze obiektów, więc można je udostępnić bez ujawniania Twoich danych.

  ## 11.O autorze

 **Dariusz Myśliwiec**: niezależny konsultant IFS, 18 lat na IFS (Apps 7.5–10 i IFS Cloud). IFS Certified Associate Consultant. PRINCE2® 7. Siedziba w Krakowie, praca zdalna w całej Europie i na świecie. Rozmawiasz z konsultantem, który pisze skrypty ekstrakcji.

 **Wybrani klienci IFS:** Fugro · LGC · BVI Medical · Betafence (PRÆSIDIAD) · Barlinek · NGK Ceramics · Newag · Oleofarm.

 IFS is a registered trademark of IFS AB; this practice is not affiliated with IFS AB. SAP is a registered trademark of SAP SE; this practice is not affiliated with SAP SE.

  ## Sprawdź swoją konfigurację IFS przed pilotażem

 Napisz, jaką wersję IFS uruchamiasz i jak jest hostowana. Na 30-minutowej rozmowie powiem, czego ekstrakcja wymaga w tej konfiguracji i czy chcesz dołączyć do pilotażu. Bez prezentacji sprzedażowej. Rozmawiasz z konsultantem, który to buduje. Warsztat zakresu i harmonogramu, który następuje potem, jest krokiem 1 [usługi migracji](https://www.ifs-erp.com/pl/marketplace-pl/migracja-danych/migracja-danych-z-ifs), którą wyceniam po nim.

 [Umów 30-minutową rozmowę techniczną](https://www.ifs-erp.com/pl/kontakt) [Cena zestawu i warunki pilotażu](#ph-sec-price)


[Read more...](https://www.ifs-erp.com/data-migration/przekazanie-danych-z-ifs.md)

## IFS Data Handover: Export Data from IFS Cloud

![IFS Data Handover: Export Data from IFS Cloud](https://www.ifs-erp.com/images/articles/ifs-data-handover-en-b4d7a7f8.webp)

Marketplace · Data migration out of IFS · MIG-EXT-001

 
## IFS Data Handover

 Migration of your data out of IFS into a new ERP, with an extraction kit as the entry point: one script per data object, a field dictionary built from your own metadata, queries that flag duplicates and gaps, and a workbook that reconciles four figures after every cycle and checks that access filters did not silently cut the result. During the pilot I deliver the kit together with the service and run the extraction with your team. Data is only read from the source database; nothing is written to IFS.

 Kit, the entry point: 2 500 EUR one-time per company

 Service quoted after the workshop

 
- In the pilot, covers IFS Applications 7.5–10 and IFS Cloud, hosted by you or managed by IFS
- Data is only read from the source database; nothing is written to IFS
- In the pilot, selection criteria are parameters, so every run is repeatable
- Target ERP does not matter: the kit produces files, the target consultant maps them

 [Book a 30-minute technical call](https://www.ifs-erp.com/en/contact) [Kit price and pilot terms](#ph-sec-price)

 ## 1.Why does moving data out of IFS stall the new ERP project?

 The consultant who loads your new ERP can only map what they understand, and an IFS database holds years of customers, suppliers and parts, with duplicates and with fields whose meaning exists only in your IFS configuration. When the extract arrives without that explanation, every trial import returns a list of questions and the cutover date moves. A second cause is silent: IFS views filter rows by company and site, so an extraction can return fewer rows than exist, without any error message.

  ## 2.What does the migration out of IFS service cover?

 The [migration out of IFS service](https://www.ifs-erp.com/en/marketplace/data-migration/migrate-data-out-of-ifs) starts with a scope and schedule workshop and then runs in cycles: extraction, consultations with your users and with the target-ERP consultant, support during cleansing, and export corrections after each trial import. The workshop is step 1 of the service and has no separate price. I quote the service after it, when the data objects, selection criteria and cycle schedule are known.

 Mapping, transformation and import stay with the target-ERP consultant. IFS Data Handover follows the file contract of the service: exports repeat with the same result because the selection lives in script parameters and not in hand-edited files.

  ## 3.What is the kit, and why is it the entry point?

 The IFS Data Handover kit is the extraction part of the service: scripts, a field dictionary and a reconciliation workbook that produce files in a fixed format, with every field described, for the migration consultant of your target ERP. It is the entry point because it is what you buy first, and everything after the extraction, from cleansing to trial imports, works on the files it produces. It fits a company that moves from IFS to SAP or another ERP and has a consultant on the target side who does the mapping and the import.

 The kit is in pilot: I deliver it to the first clients together with the service, and I run the extraction with your team. You receive the scripts, the field dictionary, the reconciliation workbook and the output files. It is not a product you buy and run on your own yet.

  ## 4.Kit price and pilot terms

 | Part | Price | How it is settled |
| --- | --- | --- |
| Kit, the entry point | 2 500 EUR one-time per company | Regular price also for pilot clients, without a discount |
| Service, starting with the scope and schedule workshop | Quoted after the workshop | Workshop, cycles, consultations and support during cleansing |

 **Order of steps:** step 1 is the workshop, which fixes the data objects, selection criteria and cycle schedule before the first script is written; step 2 is the extraction with the kit on that basis. The service is quoted after the workshop.

 **Delivery:** during the pilot, together with the service; I run the extraction with your team.

 **Pilot condition:** your consent to name your company as a reference after the target ERP goes live. Self-service purchase of the kit, without the service, opens after the pilot. There is no date for it.

  ## 5.Which IFS versions and hosting models does the kit cover?

 In the pilot, the kit covers IFS Applications 7.5–10 and IFS Cloud, whether the database is hosted by your company or the system is managed by IFS. In every setup data is only read from the source database, and nothing is written to IFS.

 
| IFS setup | Hosting |
| --- | --- |
| IFS Applications 7.5–10 | Database hosted by your company |
| IFS Cloud | Database hosted by your company (Remote deployment) |
| IFS Cloud | Managed by IFS |

  ## 6.Key features

 IFS Data Handover is delivered in the pilot together with the service, and it has these features.

 
- **Schema comparison first** - the first run compares your schema with the reference schema the scripts are built and tested against in the pilot, so a renamed or changed column shows up before the first export and not in the target ERP.
- **One script per data object** - customers, suppliers, parts, projects and open balances, with the selection criterion (for example customers with a purchase in the last 5 years) as a parameter.
- **Field dictionary from your metadata** - generated from the metadata of your IFS installation, so it follows your system and not a fixed list.
- **Duplicate and gap flag queries** - the matching rules (name, tax number, address) are configurable, and the flags travel with the export so your users meet them at the start of cleansing.
- **Reconciliation workbook** - the four figures after each cycle: records in IFS per criteria, duplicates merged, records excluded with a reason, records in the target ERP after import.
- **Completeness check** - compares the row count the extraction returns with a count from an IFS report.
- **Access checklist** - what to arrange, with whom and in what order, before the first run.

  ## 7.Why does the kit check completeness against access-filtered views?

 IFS views filter rows by company and site, so an extraction can receive fewer rows than exist, with no error message. An export that is silently short makes the first reconciliation figure, records in IFS per criteria, wrong from the start. In the pilot, the completeness check compares the count returned by the extraction with a count from an IFS report. The figures match or the difference is explained; otherwise the cycle is not closed.

  ## 8.What is in the kit and what is not?

 The table lists what IFS Data Handover contains when it is delivered in the pilot together with the service.

 
| Element | In the kit | Note |
| --- | --- | --- |
| Schema comparison step | Yes | First step of every use of the kit on a new IFS system |
| Extraction scripts per data object | Yes | Customers, suppliers, parts, projects, open balances; selection criteria as parameters |
| Field dictionary | Yes | Generated from your metadata, custom fields included where the system exposes them |
| Duplicate and gap flag queries | Yes | Matching rules configurable |
| Reconciliation workbook | Yes | Four figures per cycle, plus the completeness check |
| Access checklist | Yes | Per IFS version and hosting model |
| Object register, decision log, contact list, cycle schedule | No | Process documents, see [Implementation Documentation](https://www.ifs-erp.com/en/marketplace/implementation-docs) |
| Scope and schedule workshop, consultations, cleansing with your users, export corrections after trial imports | No | Part of the [migration out of IFS service](https://www.ifs-erp.com/en/marketplace/data-migration/migrate-data-out-of-ifs), quoted after the workshop |
| Mapping to the target ERP, transformation, import | No | Done by the target-ERP migration consultant |

  ## 9.What do you need for the extraction?

 - **Access to the data** of the IFS system you migrate from, arranged as described in the access checklist.
- **An IT contact** who arranges the access and keeps the output files inside your company.
- **A target-ERP migration consultant** who maps the files.
- **Business users** from sales, finance and projects who cleanse and accept the data.

 Data is only read from the source database. By design, business data lands only in the output files at your company, never in logs, so share those files only with the people who clean and map them.

  ## 10.Frequently asked questions

 Can I buy and run IFS Data Handover on my own now? No. IFS Data Handover is in pilot, and the kit is delivered to pilot clients together with the service while I run the extraction with the client's team. Self-service purchase of the kit opens after the pilot, and there is no date for it.

   What does a pilot client pay and give in return? A pilot client pays two things: the regular price of the IFS Data Handover kit, 2 500 EUR one-time per company, without a discount; and the service (scope and schedule workshop, cycles, consultations, support during cleansing), which is quoted after the workshop. In return the client consents to be named as a reference after the target ERP goes live.

   Does IFS Data Handover work for IFS Cloud managed by IFS? Yes, in the pilot. IFS Data Handover covers IFS Cloud managed by IFS. Data is only read from the source database; nothing is written to IFS.

   Does IFS Data Handover install anything in IFS? No. Data is only read from the source database; nothing is written to IFS and nothing is installed in it, so IFS Data Handover leaves no objects to review at the next IFS update.

   Does the field dictionary include our custom fields? Where the system exposes them, yes. In the pilot I generate the dictionary from the metadata of your IFS installation, so it includes custom fields where they exist: views ending in `_CFV` and columns starting with `CF$_`, which IFS Applications has from version 8 and IFS Cloud keeps. IFS Applications 7.5 has no custom fields.

   Why not use the Data Migration Manager to export from IFS? The IFS Data Migration Manager loads data into IFS, and its export function moves job definitions between environments, not business data. Leaving IFS therefore needs a separate extraction, which is what IFS Data Handover provides.

   Who maps the exported files to the new ERP? The migration consultant of the target ERP. IFS Data Handover delivers a fixed file format with a described field set, and mapping to the target ERP's templates, transformation and import are done on the target side. The IFS consultant stops at the described file.

   Where does the business data from the extraction end up? Only in the output files at your company. By design, IFS Data Handover keeps business data such as supplier names, prices and addresses out of its logs, and the logs are to hold only object keys, so they can be shared without exposing your data.

  ## 11.About the author

 **Dariusz Myśliwiec**: independent IFS consultant, 18 years on IFS (Apps 7.5–10 and IFS Cloud). IFS Certified Associate Consultant. PRINCE2® 7. Based in Kraków, working remotely across Europe and globally. You talk to the consultant who writes the extraction scripts.

 **Selected IFS clients:** Fugro · LGC · BVI Medical · Betafence (PRÆSIDIAD) · Barlinek · NGK Ceramics · Newag · Oleofarm.

 IFS is a registered trademark of IFS AB; this practice is not affiliated with IFS AB. SAP is a registered trademark of SAP SE; this practice is not affiliated with SAP SE.

  ## Check your IFS setup before the pilot

 Tell me which IFS version you run and how it is hosted. On a 30-minute call I tell you what the extraction needs in that setup and whether you want to join the pilot. No pitch. Talk to the consultant who builds it. The scope and schedule workshop that follows is step 1 of the [migration service](https://www.ifs-erp.com/en/marketplace/data-migration/migrate-data-out-of-ifs), which is quoted after it.

 [Book a 30-minute technical call](https://www.ifs-erp.com/en/contact) [Kit price and pilot terms](#ph-sec-price)


[Read more...](https://www.ifs-erp.com/data-migration/ifs-data-handover.md)

## Migrate Data Out of IFS to SAP or Any New ERP

![Migrate Data Out of IFS to SAP or Any New ERP](https://www.ifs-erp.com/images/articles/migrate-data-out-of-ifs-en-32136128.webp)

Independent IFS practice · Data migration out of IFS

 
## Your IFS data, described field by field, ready for the SAP consultant or any other target ERP

 The consultant who loads your new ERP can only map what they understand, and an IFS database holds years of customers, suppliers and parts, with duplicates and with fields whose meaning exists only in your IFS configuration. When the extract arrives without that explanation, every trial import returns a list of questions and the cutover date moves. I extract the data from IFS read-only, describe every field, flag duplicates and suspicious records, support your users while they cleanse, and adjust the export after each trial import. The target-ERP consultant maps and loads.

 
- IFS is only read: nothing is installed or changed in IFS
- One fixed file format and a description of every field
- Repeatable extraction scripts, so every export gives the same result
- SAP is the worked example here; the process is the same for any target ERP

 [Book a 30-minute technical call](https://www.ifs-erp.com/en/contact) [What I need to start](#ph-sec-start)

 ## Key takeaways

 - The export file is the contract between IFS and the target ERP: fixed format, every field described, changes only through a logged question and decision list.
- The work runs as five steps with five checkpoints. Step 1 happens once, steps 2 to 5 repeat in three planned cycles: trial import, full volume, final run.
- After every cycle four figures are reconciled: records in IFS per criteria, duplicates merged, records excluded with a reason, records in the target after import. A cycle with unexplained differences stays open.
- Scope is empty by default and every object is added deliberately, with a selection criterion such as customers with a purchase in the last 5 years.
- A change request from the target side changes the extraction script, never the file by hand, so the next export on current data repeats the fix.

  ## 1.Where does my scope end and the target consultant's begin?

 The IFS consultant's scope ends at the described export file. Everything that happens to the data after it leaves IFS, from mapping to the target ERP's templates through to the final import, belongs to the target-ERP migration consultant, and the substantive cleansing belongs to your users. Three parties work together: your users, the IFS consultant and the target-ERP consultant.

 
| In my scope (IFS consultant) | Outside my scope (target-ERP consultant and client users) |
| --- | --- |
| Repeatable extraction scripts for IFS | Mapping my files onto the target ERP's templates |
| Excel files with a description of where every field comes from | Transforming the data into the target ERP's format |
| Flagging duplicates and suspicious data | Trial and final import into the target ERP |
| Consultations with your users and with the target-ERP consultant | Cleansing and acceptance of the data (client users) |
| Changes to the export after each trial import | Configuration and validation in the target ERP |

 Decisions to merge or exclude a record are taken by your users. I point at the suspicious data and explain what each field means in IFS.

  ## 2.What does it mean that the file is the contract?

 The export file is the contract between IFS and the target ERP because its format is fixed, every field in it is described, and any change goes through a written, versioned log. Four rules make that work.

 
- **Fixed file format** - I do not adapt the file to the target ERP. The target-ERP consultant maps it, which is why the format of my file does not change between cycles.
- **Every field has a description** - where the field comes from in IFS and what it means.
- **Changes go through a log** - questions and needs from the target side are written down and versioned in the question and decision log.
- **Scripts, not manual fixes** - a change of the export mechanism goes into the extraction script and never into a hand-edited export file, so every export can be repeated with the same result.

 Data flows in one direction: IFS, then Excel export files with field descriptions and flags, then cleansing by your users, then mapping and import by the target-ERP consultant. IFS is only read. Your users cleanse the data in the exported files, and a change of the export mechanism is made in the extraction script. This works with IFS Cloud and with on-premise IFS Applications. The channel used for read-only extraction depends on the version and the hosting model, and it is agreed in step 1.

  ## 3.What are the five steps and their checkpoints?

 The migration out of IFS has five steps, and each ends in a checkpoint that must be met before the next step starts. Step 1 is done once at the start. Steps 2 to 5 repeat in migration cycles until the import into the target ERP passes without errors.

 
| Step | What happens | Checkpoint | Deliverables |
| --- | --- | --- | --- |
| 1. Scope and schedule | I agree with your contact persons which data I export and by when. Contacts for sales, finance, project and the target ERP, objects in scope, selection criteria, cycle dates agreed with the target-ERP consultant. | Scope approved | Contact list, object register, selection criteria, cycle schedule, access to IFS data, consultation plan, question and decision log |
| 2. Export from IFS | I extract with scripts I can run repeatedly and hand over Excel files: one file per data object, every field described, suspected duplicates and gaps flagged, the same script in every cycle. | Files handed over | Extraction scripts, Excel files, suspicious records, field dictionary |
| 3. Verification and cleansing | Your users review the files with me explaining each field: they remove and merge duplicates, fill gaps, correct errors and decide whether a record is migrated or skipped. | Data accepted | Cleansed files, merge list, exclusion list, questions to the source, area acceptance |
| 4. Mapping and import | I explain the fields in sessions with the target-ERP consultant, who maps them and runs the trial import. My file format does not change. Questions and new needs come back to me. | Trial import done | Files handed over, consultation notes, target-ERP question log, trial import result |
| 5. Corrections and acceptance | I change the export mechanism according to what the import showed, until the data lands in the target ERP without errors. Export again on current data, cleanse only new records, final export in the cutover window. | Data in the target ERP | Final files, new script version, record reconciliation, acceptance protocol |

  ## 4.How do the three cycles and the four reconciliation figures work?

 A migration out of IFS runs in three export-to-import cycles before the target ERP goes live: a trial import, a full-volume run and a final run. Each cycle repeats steps 2 to 5 with the same script on current data. The schedule is indicative, and the number of cycles and the import dates are agreed with the target-ERP consultant in step 1.

 After every cycle we reconcile four figures between IFS, the file after cleansing and the target ERP:

 
1. **Records in IFS** - counted according to the agreed selection criteria.
2. **Duplicates merged** - the decisions of your users.
3. **Records excluded** - each with a stated reason.
4. **Records in the target ERP** - counted after the import.

 The numbers match or we know why. A cycle with an unexplained difference is not closed.

 The feedback loop is a normal part of the process. After a trial import the target-ERP consultant reports questions, gaps and new needs. I modify the script and do not edit the file by hand, run the export again on current data, and your users cleanse only the difference. Each run is repeatable: the same script, current data, a predictable result.

  ## 5.Which data goes into the export and which stays out?

 The default scope of the export is nothing, and each data object is added deliberately with a selection criterion. Master data is in scope for certain, and the remaining objects are settled at the scope workshop. The table shows the preliminary scope with example criteria.

 
| Data object (area) | Example selection criterion |
| --- | --- |
| Customers (sales) | Purchase in the last 5 years |
| Suppliers (finance) | Invoice or order in the last N years |
| Parts (sales) | Movement or stock in a chosen period |
| Projects (project) | Open projects and projects in progress |
| Open balances (finance) | To be decided: migrate or enter manually |

 Duplicates are flagged already at export, so your users meet them at the start of cleansing and not after the first import. There is one script per data object, run as many times as the cycles require. A dictionary with fewer than 20 entries is faster to enter manually in the target ERP than to migrate.

  ## 6.How are consultations planned?

 Consultations are a separate item in the plan and in the quote, because explaining where data comes from takes time that a pure export estimate does not contain. There are two kinds: with the target-ERP consultant about the meaning of fields and questions after import, and with your users about the origin of data and support during cleansing. They take place after the export and after every trial import, against the question log, at a fixed weekly slot. The hours are sized after the scope workshop, when the objects and criteria are known.

  ## 7.What can delay the migration and how is each risk handled?

 Five risks delay a migration out of IFS, and each has a countermeasure built into the plan. The risks are reviewed at every status meeting.

 
| Risk | Countermeasure |
| --- | --- |
| Unclear data scope | Scope and criteria approved in step 1 |
| Client people not available | Named people and dates in the schedule |
| Cleansing takes longer than planned | Duplicates flagged already at export |
| New target-ERP needs after import | Repeatable scripts and the next cycle already in the plan |
| Consultations underestimated | Consultation time as a separate plan line |

  ## 8.What do I need before the first export?

 I need five contacts before the export starts, and the names and details of the contact persons and of the target-ERP consultant are the condition for starting step 1.

 
- **Sales** - contact person for customers and parts.
- **Finance** - contact person for suppliers and balances.
- **Project** - contact person for projects.
- **Target ERP** - the migration consultant (for SAP, the SAP migration consultant).
- **IT** - access to the IFS data.

 With the area contacts I agree the export scope and the way of cleansing. With the target-ERP consultant I agree cycle dates and how files are handed over. Five agreements are made before the first script exists:

 
1. Data objects in the migration scope.
2. Selection criteria for each object.
3. Contact persons from the areas and the target-ERP consultant.
4. Who cleanses which data and by when.
5. Dates of the cycles and of the imports into the target ERP.

 The contact list, the object register and the question and decision log are the working documents of this process. How such documents are kept across an IFS project is described in the [Implementation Documentation](https://www.ifs-erp.com/en/marketplace/implementation-docs) section.

  ## 9.Frequently asked questions

 Does the IFS extraction work for a target ERP other than SAP? Yes. The extraction from IFS is the same for any target ERP, because I deliver a fixed file format with a description of every field and the target-ERP consultant does the mapping to the target's own templates. SAP is the worked example on this page; the steps, files and checkpoints do not change with the target system.

   Does the extraction change anything in our IFS system? No. IFS is only read, and nothing is installed or changed in it. Corrections are made in the exported files during cleansing or in the extraction script when the export mechanism changes. The process works with IFS Cloud and with on-premise IFS Applications, and the read-only channel is agreed per version in step 1.

   Do you map the data to SAP templates and import it? No. Mapping to SAP templates, transformation to the SAP format, the trial and final import, and configuration and validation in SAP belong to the SAP migration consultant. The IFS consultant delivers the extraction scripts, the Excel files with field descriptions, the flagged duplicates and suspicious data, the consultations, and changes to the export after each trial import.

   How many migration cycles does an IFS data migration need? An IFS data migration plans three export-to-import cycles before the target ERP starts: a trial import, a full-volume run and a final run in the cutover window. The exact number of cycles and the import dates are agreed in step 1 with the target-ERP consultant, and the cycles repeat until the import passes without errors.

   How do you prove that no records were lost between IFS and the new ERP? After every cycle four figures are reconciled: records in IFS per the selection criteria, duplicates merged, records excluded with a reason, and records in the target ERP after import. The numbers match or the difference is explained, and a cycle with an unexplained difference is not closed.

   Which IFS data should not be migrated? The scope of an IFS data migration starts empty, and each object is added with a selection criterion, for example customers with a purchase in the last 5 years, suppliers with an invoice or order in the last N years, parts with movement or stock in a chosen period, open projects and projects in progress. Dictionaries with fewer than 20 entries are entered manually in the target ERP, and open balances are decided case by case between migration and manual entry.

   What if I am migrating data into IFS Cloud and not out of it? Inbound migration into IFS Cloud is a separate topic with its own tools and load sequence. If you are moving to IFS Cloud, see the [data migration section of the marketplace](https://www.ifs-erp.com/en/marketplace/data-migration).

  ## 10.About the author

 **Dariusz Myśliwiec**: independent IFS consultant, 18 years on IFS (Apps 7.5–10 and IFS Cloud). IFS Certified Associate Consultant. PRINCE2® 7. Based in Kraków, working remotely across Europe and globally. You talk to the consultant who writes the extraction scripts and explains the fields to your users.

 **Selected IFS clients:** Fugro · LGC · BVI Medical · Betafence (PRÆSIDIAD) · Barlinek · NGK Ceramics · Newag · Oleofarm.

 IFS is a registered trademark of IFS AB; this practice is not affiliated with IFS AB. SAP is a registered trademark of SAP SE; this practice is not affiliated with SAP SE.

  ## Start with the scope and schedule workshop

 The next step is a workshop on scope and schedule: contacts from sales, finance, project and the target-ERP consultant, the data objects and selection criteria, and a cycle schedule agreed with the target-ERP consultant. No pitch. Talk to the consultant who builds the extraction.

 [Book a 30-minute technical call](https://www.ifs-erp.com/en/contact) [See Implementation Documentation](https://www.ifs-erp.com/en/marketplace/implementation-docs)


[Read more...](https://www.ifs-erp.com/data-migration/migrate-data-out-of-ifs.md)