Implementer: Interface Register (IDK-13)

The IDK-13 template lists every interface between IFS Cloud and other systems: what flows, by which technology, who owns it and what happens to the legacy system behind it. In Implementer the same list is a register. Each interface is a row with an owner, a lifecycle state and an audit trail, and the rows feed the gate checklists and the test coverage view. For a wider view of the product see Implementation support for IFS Cloud.

What you get in the application

Interfaces sits in the Registers group of the project menu, next to Risks, Issues, Change requests, CRIM objects and Defects. It opens as a list or a Kanban board; the Board and List buttons switch the view. The list columns are key (INT-001 and so on), title, status, direction, technology, owner and due date. You can search by key or title, filter by status and switch between Anyone and Mine.

Opening a row shows a drawer with the tabs Fields, Links, Attachments and History. The fields are in five groups:

How to use it

  1. Open Interfaces and choose New Interface. Give it a title. The row gets its key and starts as Identified.
  2. Fill the scope and technical groups. Choose Propose for decision; direction, source system, target system and technology must be set first.
  3. The decision step is Approve. It needs the legacy decision. Send back returns the interface to Identified. The solution architect, technical solution manager and project managers hold this action.
  4. Mark as specified needs the specification reference. Start build and Submit for test follow.
  5. In test, Test failed sends the interface back to build and creates a defect in the Defects register, titled after the interface and pointing at it. Accept needs the test evidence and is held by the test lead, the system owner, the application consultant, the solution architect, the technical solution manager and project managers.
  6. Go live needs the go-live date. Retire is available from every state except Retired and needs a reason.
  7. Drag a card on the Board to run the same transition. The action buttons in the drawer header do the same thing.

Screenshots

Interface register as a list with status, direction, technology and owner columns

The interface register in list view with status, direction, technology and owner. Demo data.

How it maps to the template

Template section Implementer
Identification and flow (name, direction, systems, data) Scope group on the interface
Mechanism and security (technology, access, frequency, volume) Technical group; authentication in the Support group
Error handling error_handling field
Legacy system and decision Legacy group, decision recorded at Approve
Status and go-live Lifecycle state, go-live date, test evidence
Credentials owner Service account and permission set references, support owner
Scope of interfaces (IDK-02) Scope status, counted on the scope statement

Gate and approval behaviour

The register is evidence for four checklist items in the IDK-08 gates:

A transition that lacks a required field opens a dialog asking for it. An action your role cannot take, or that is not allowed in the current state, appears greyed out with a tooltip giving the reason. Every transition and field change is written to the History tab.

Not in the application yet