---
title: "Interfaces"
description: "A comprehensive technical deep dive into transitioning from Oracle database links to modern IFS Cloud connectivity standards. Covers OData provider setup, OAuth2 security, and IFS Connect orchestration for robust Data Mesh architecture"
---

# Interfaces

## Modernizing IFS Cloud Interfaces

 Transitioning from legacy CRIMS methodologies to IFS Cloud requires a fundamental shift in integration strategy. Moving from direct Database Links to REST APIs and OData providers is not just a technical upgrade, it is a strategic leap towards secure, scalable, and cloud-native connectivity.

 
---

 ## 1 From Database Links to REST APIs

 In on-premise environments, direct database links were the standard for data exchange. IFS Cloud deprecates this tight coupling in favor of a service-based architecture. Migration involves encapsulating business logic behind secure endpoints.

 
- **Decoupling:** Remove direct dependencies on underlying table structures.
- **Security:** OAuth2 authentication replaces direct database login credentials.
- **Validation:** Data flows through business logic validation layers, preventing data corruption.

 ## 2 Power of OData Providers

 OData (Open Data Protocol) serves as the primary standardized protocol for querying and updating IFS Cloud data. It allows for seamless integration with tools like Excel, Power BI, and third-party apps without writing custom PL/SQL.

 ##### Key Advantage

 OData providers automatically expose the IFS entity model, allowing developers to query data using standard URL conventions (e.g., `$filter`, `$select`) immediately after deployment.

 ### Connectivity Architecture

  

 
#### Internal Integrations: IFS Connect

 For integrations residing within the IFS ecosystem or local network boundaries, IFS Connect remains the robust orchestration engine.

 
---

 
- **Batch Processing:** Handle high-volume asynchronous file transfers.
- **Routing Rules:** Content-based routing to direct messages to specific application queues.
- **Transformers:** Native XSLT and Java transformers to map XML/JSON formats internally.

  

 
#### External Connectivity: Middleware

 To connect IFS Cloud with the outside world (banks, logistics, 3rd party SaaS), an external middleware layer is recommended to manage API throttling and authentication.

 
---

 
- **Boomi / Azure Logic Apps:** Acts as the handshake layer between IFS APIs and external endpoints.
- **Protocol Translation:** Convert SOAP, FTP, or flat files from partners into IFS REST calls.
- **Resilience:** Provides buffering and retry mechanisms if the IFS Cloud instance is under maintenance.

 ### Ready to Migrate?

 Modernizing your interfaces ensures your ERP is future-proof, secure, and ready for AI and automation. Start by mapping your current database links to the corresponding IFS Cloud Entity APIs.

 [Download Migration Checklist](#)


## IFS Cloud - ROHLIG SUUS Logistics Interface

![IFS Cloud - ROHLIG SUUS Logistics Interface](https://www.ifs-erp.com/images/SUUS_Interface.webp)

## At a glance

 Faster, cleaner freight forwarding through a direct data link between **IFS Cloud** and **ROHLIG SUUS Logistics**:

 
- **Book freight straight from your ERP:** transport orders go out automatically – no re-keying, no carrier portal.
- **Clean data, first time:** shipment details are checked against carrier requirements before anything is sent.
- **No middleware:** built natively on IFS Workflow, with no third-party integration platform to buy or maintain.

 ## Automated Freight Booking: IFS Cloud Integration with ROHLIG SUUS

 Connect your ERP directly to ROHLIG SUUS and take full control of your transport and contract logistics processes – without leaving IFS Cloud.

 "Because the integration runs on standard IFS Cloud functionality, there's no middleware in the middle – and booking a transport order with ROHLIG SUUS takes seconds, not minutes."

 ### Paperless order flow

 The moment a shipment is released, its details are sent straight to ROHLIG SUUS. The carrier's booking reference comes back automatically and is linked to the right shipment in IFS Cloud – so your team always knows which order is which.

 ### Errors caught before they cost you

 Built-in validation checks every shipment against the carrier's requirements – postcode formats, weights, dimensions and more. Incomplete or incorrect bookings are stopped at source, not discovered at the loading dock.

 ### Native to IFS Cloud

 The interface is built with **IFS Workflow**, so the business logic can be tailored to how you actually ship – whether that's groupage (LTL), full truckloads (FTL) or warehousing services provided by SUUS.

 ### Frequently asked questions

 Will we see it if ROHLIG SUUS rejects a booking?

 Yes. Any validation or technical error returned by the carrier is logged immediately on the shipment header in IFS Cloud, so your logistics team can fix the problem and resend without chasing anyone.

 Is it reliable enough for day-to-day operations?

 With no third-party system in between, there are fewer moving parts – lower running costs, better data security and fewer points of failure. The process depends only on IFS Cloud and the ROHLIG SUUS system being available.

 Can the integration cover more than road freight?

 Absolutely. The interface is designed to grow with you and can support the wider ROHLIG SUUS Logistics portfolio, including sea and air freight as well as value-added warehouse services (VAS).

 ## Streamline your logistics with ROHLIG SUUS

 Find out how quickly a native interface can be rolled out in your IFS Cloud environment – and how much time it can save your shipping and warehouse teams.

 [Talk to an expert](https://www.ifs-erp.com/en/contact)


[Read more...](https://www.ifs-erp.com/interfaces/interface-ifs-cloud-rohlig-suus-logistics.md)

