---
title: "IFS Cloud - ROHLIG SUUS Logistics Interface"
date: 2026-02-09
description: "Automate shipping in IFS Cloud. Connect your ERP to ROHLIG SUUS Logistics with no middleware, and create waybills and track orders natively. See the benefits!"
author: "Dariusz Mysliwiec"
intro_image: "https://www.ifs-erp.com/images/SUUS_Interface.webp"
fulltext_image: "https://www.ifs-erp.com/images/SUUS_Interface.webp"
categories:
  - name: "Interfaces"
    url: "https://www.ifs-erp.com/interfaces.md"
tags:
  - name: "Delivery"
    url: "https://www.ifs-erp.com/tags/delivery.md"
  - name: "Interfaces"
    url: "https://www.ifs-erp.com/tags/interfaces.md"
  - name: "Shipments"
    url: "https://www.ifs-erp.com/tags/shipments.md"
  - name: "Integration"
    url: "https://www.ifs-erp.com/tags/integration.md"
---

# IFS Cloud - ROHLIG SUUS Logistics Interface

![IFS Cloud - ROHLIG SUUS Logistics Interface](https://www.ifs-erp.com/images/SUUS_Interface.webp)

## At a glance

 Faster, cleaner freight forwarding through a direct data link between **IFS Cloud** and **ROHLIG SUUS Logistics**:

 
- **Book freight straight from your ERP:** transport orders go out automatically – no re-keying, no carrier portal.
- **Clean data, first time:** shipment details are checked against carrier requirements before anything is sent.
- **No middleware:** built natively on IFS Workflow, with no third-party integration platform to buy or maintain.

 ## Automated Freight Booking: IFS Cloud Integration with ROHLIG SUUS

 Connect your ERP directly to ROHLIG SUUS and take full control of your transport and contract logistics processes – without leaving IFS Cloud.

 "Because the integration runs on standard IFS Cloud functionality, there's no middleware in the middle – and booking a transport order with ROHLIG SUUS takes seconds, not minutes."

 ### Paperless order flow

 The moment a shipment is released, its details are sent straight to ROHLIG SUUS. The carrier's booking reference comes back automatically and is linked to the right shipment in IFS Cloud – so your team always knows which order is which.

 ### Errors caught before they cost you

 Built-in validation checks every shipment against the carrier's requirements – postcode formats, weights, dimensions and more. Incomplete or incorrect bookings are stopped at source, not discovered at the loading dock.

 ### Native to IFS Cloud

 The interface is built with **IFS Workflow**, so the business logic can be tailored to how you actually ship – whether that's groupage (LTL), full truckloads (FTL) or warehousing services provided by SUUS.

 ### Frequently asked questions

 Will we see it if ROHLIG SUUS rejects a booking?

 Yes. Any validation or technical error returned by the carrier is logged immediately on the shipment header in IFS Cloud, so your logistics team can fix the problem and resend without chasing anyone.

 Is it reliable enough for day-to-day operations?

 With no third-party system in between, there are fewer moving parts – lower running costs, better data security and fewer points of failure. The process depends only on IFS Cloud and the ROHLIG SUUS system being available.

 Can the integration cover more than road freight?

 Absolutely. The interface is designed to grow with you and can support the wider ROHLIG SUUS Logistics portfolio, including sea and air freight as well as value-added warehouse services (VAS).

 ## Streamline your logistics with ROHLIG SUUS

 Find out how quickly a native interface can be rolled out in your IFS Cloud environment – and how much time it can save your shipping and warehouse teams.

 [Talk to an expert](https://www.ifs-erp.com/en/contact)
