---
title: "Marketplace"
date: 2026-01-02
description: "CRIMS Marketplace for IFS Cloud: browse pre-built configurations, reports, interfaces, modifications, security, data migration and implementation docs packages."
author: "Dariusz Mysliwiec"
intro_image: "https://www.ifs-erp.com/images/articles/marketplace-en-5ac50477.webp"
fulltext_image: "https://www.ifs-erp.com/images/articles/marketplace-en-5ac50477.webp"
categories:
  - name: "Marketplace"
    url: "https://www.ifs-erp.com/marketplace.md"
tags:
  - name: "CRIMS"
    url: "https://www.ifs-erp.com/tags/crims.md"
  - name: "Configurations"
    url: "https://www.ifs-erp.com/tags/configurations.md"
  - name: "IFS Cloud functional consultant"
    url: "https://www.ifs-erp.com/tags/ifs-cloud-functional-consultant.md"
  - name: "IFS Cloud implementation"
    url: "https://www.ifs-erp.com/tags/ifs-cloud-implementation.md"
---

# Marketplace

![Marketplace](https://www.ifs-erp.com/images/articles/marketplace-en-5ac50477.webp)

## The CRIMs Marketplace

 Stop reinventing the wheel. Accelerate your time-to-value with proven, pre-packaged solutions designed for the Evergreen era.

 
---

 For decades, every IFS customer has faced the same challenge: the gap between standard functionality and unique business reality. CRIMs fill this gap. Until now, every organization has built these from scratch, which is expensive, slow, and risky.

 We are introducing a paradigm shift: A curated Marketplace of pre-built, compliant, and install-ready CRIMS tailored for IFS Cloud.

 ## The Marketplace Concept

 Standardized Solutions. Accelerated Deployment.

 The CRIMs Marketplace is designed to operate like an "App Store" for your ERP. Instead of engaging in lengthy consulting cycles to define a common requirement (e.g., a specific EDI integration or a standard warehouse Lobby), you can browse a catalog of vetted solutions.

 Each package is delivered via standard IFS tools like Application Configuration Packages (ACPs) or Data Migration jobs ensuring they respect the IFS Cloud Extensibility Framework and are ready for bi-annual upgrades.

 ### The Catalog: CRIMS + Essentials

 [Configurations](https://www.ifs-erp.com/index.php?Itemid=1584) (C)

 Tailor the user experience without coding. Automate routine workflows with custom events. Visualize KPIs on role-based Lobbies. Add industry-specific data fields instantly. Streamline complex data entry processes. Bridge gaps in standard functionality seamlessly. Ensure Evergreen upgrade compatibility.

 [Reports](https://www.ifs-erp.com/index.php?Itemid=1592) (R)

 Gain instant operational visibility. Pre-built Quick Reports for immediate insights. Formatted business documents ready for print. Eliminate reliance on external BI tools. Drill down into financial anomalies quickly. Track inventory aging dynamically. Make data-driven decisions faster.

 [Interfaces](https://www.ifs-erp.com/index.php?Itemid=1585) (I)

 Connect IFS Cloud to the world. Standardized REST API integration packages. Seamless data exchange with 3PL providers. Synchronize e-commerce platforms in real-time. Robust error handling mechanisms built-in. Accelerate connecting disparate systems. Replace fragile legacy file transfers.

 [Modifications](https://www.ifs-erp.com/index.php?Itemid=1586) (M)

 Extend core server logic safely. Fine-tune Aurena page layouts precisely. Inject specific business validations where needed. Adapt the system to unique competitive processes. Utilize the official extensibility framework strictly. Minimize impact on future updates. Maintain competitive advantage through customization.

 [Security](https://www.ifs-erp.com/index.php?Itemid=1587) (S)

 Lock down sensitive data effectively. Pre-configured best-practice Permission Sets. Accelerate role-based access control (RBAC) setup. Ensure Segregation of Duties (SoD) compliance. Simplify complex user onboarding processes. Pass external security audits with confidence. Protect against unauthorized transaction execution.

 [Data Migration](https://www.ifs-erp.com/index.php?Itemid=1589) (D)

 De-risk your path to the cloud. Proven migration job templates are ready to use. Standardized Excel staging sheets included. Pre-built validation logic to clean data. Accelerate legacy data extraction efforts. Ensure master data integrity pre-go-live. Reduce cutover weekend stress significantly.

 [Implementation Docs](https://www.ifs-erp.com/index.php?Itemid=1590) (D)

 Standardize your project delivery methodology. Validated functional specification templates ready to deploy. Comprehensive technical design document structures. Pre-written test scripts for rigorous UAT. Ready-to-use cutover plans and checklists. Ensure consistent quality across all workstreams. Reduce documentation overhead significantly.

  

 ### Frequently Asked Questions

 ## 

 Yes, all our marketplace items are strictly tested against the latest IFS Cloud AU releases. We also maintain compatibility versions for IFS Applications 10.

 ## 

 Upon purchase, you will receive a secure download link containing the export files (App/ins), installation guides, and documentation. For complex integrations, we provide a 1-hour handover call.

 ## 

 Absolutely. You own the code for your instance. The CRIMs are delivered as open PL/SQL or Java packages, allowing your internal team to make further adjustments if needed.

 ### Ready to Optimize?

 Browse our catalog and select the CRIMs that fit your business needs immediately.

 [Order Now](https://www.ifs-erp.com/index.php?Itemid=1592)

 ### Need Something Unique?

 Don't see what you are looking for? We build custom interfaces, modifications, and reports from scratch.

 [Request New Functionality](https://www.ifs-erp.com/en/contact)
