Bill of Materials
A bill of materials in IFS Cloud defines which components, in which quantities, make up a manufactured part, and it feeds planning, shop orders and costing. For products that come in many variants, a fixed structure per variant leads to a catalog that is hard to maintain. This tag collects material on how structures are built and when to replace static ones with configuration.
Static structures and their limit
A static bill of materials lists a fixed set of components. It is simple, transparent and works well for standard products. When customers choose options, however, the number of structures grows with every combination, and each one needs its own part number, its own revision and its own maintenance. Errors enter when a change to a common component has to be repeated in dozens of structures.
Configure to order
Configure to order lets the customer or salesperson choose characteristics, and the system derives the structure and the routing for that specific order from rules. The company maintains one configurable product and a set of rules, not an ever-growing family of parts. The price is a more demanding design phase, because the rules must be correct and tested.
Questions to settle
- How many variants are really sold, and how many are theoretical?
- Who owns the configuration rules and approves changes to them?
- How are configured parts purchased, planned and costed?
- Which structure type is used for engineering and which for manufacturing, and how are they kept in step?
Revisions and changes
Whatever approach is chosen, define how structure changes are controlled, with effective dates and approval, so that open shop orders keep consistent material lists.
The article under this tag compares both approaches with attention to maintenance effort over time.
A way to decide
List the products sold in the last year with the options chosen on each order. If a handful of combinations account for most of the orders, static structures remain the simpler choice. If nearly every order is a new combination, the structure family keeps growing and configuration pays for its design effort at the first change of a common component.
