Skip to main contentSkip to footer

Handling Unit

A handling unit in IFS Cloud is the physical packing unit that holds goods, such as a pallet, a box or a container, and it has its own identity so that it can be tracked through storage, picking and shipping. Handling units make it possible to move a pallet as one object and still know its contents.

Structure

A handling unit has a type, which defines properties such as dimensions and tare weight, and it can contain parts or other handling units. A pallet holding several boxes is a nested structure. Each unit can have a label with an identifier that is scanned during warehouse operations.

Where handling units are used

  • Inventory: stock is held per handling unit, and a move of the unit moves the contents.
  • Picking and packing: goods are packed into units and the packing proposal can suggest the grouping.
  • Shipments: the shipment lists the units and their weights, which carriers and customs need.
  • Receiving: incoming units can be registered with an identifier that carries the content information from the supplier.

Consolidated shipments

A consolidated shipment combines goods from several orders for the same receiver into one delivery. Handling units are the bridge, because each order's goods can sit in their own unit or be mixed in a shared unit, and the choice affects how the delivery documents show the content.

Before introducing handling units, check whether the warehouse really needs unit-level tracking, since it demands discipline in scanning and in label printing. The article under this tag explains shipment types and the role of handling units in consolidation.

Label design needs a decision too: which identifier format is used, whether the supplier's labels are accepted at receiving, and who prints replacements for damaged ones. A scanner that cannot read a label stops a whole pallet, so the rules for labels belong in the warehouse procedure and in the training material.

Kalkulator ROI

Oblicz zwrot z inwestycji

WartoÅ?ci wejÅ?ciowe

€
€
€

Wyniki

Roczne oszczÄ?dnoÅ?ci
€ 0
Okres zwrotu
0 months
ROI
0%
MiesiÄ?czne oszczÄ?dnoÅ?ci
€ 0

Pobierz szczegóÅ?owy raport

Podaj swoje dane, aby otrzymaÄ? szczegóÅ?owy raport ROI.