Skip to main contentSkip to footer

IFS Cloud architecture

IFS Cloud architecture describes how the solution is built and run: the application layers, the Aurena web client, the integration endpoints, the database and the environments that carry a change from design to production. Knowing this structure is what lets a consultant judge where a requirement should be solved and what a release update will touch.

Layers that matter in practice

Business logic is organised in logical units and projections. Aurena presents it to users, and the same projections are what external tools reach through OData and REST. Configuration sits on top of that logic, and customizations should be built through the supported extension points so they travel with the release process instead of fighting it.

Environments are an architecture decision

Each environment has a purpose. A development or build area is where changes are made, a test area is where they are verified against realistic data, and production is where nothing is changed ad hoc. The number of environments, how often test is refreshed from production and what is masked during a refresh are design choices with consequences for testing quality, cost and data protection.

  • Refresh policy: a stale test environment gives a false sense of safety.
  • Change flow: one route from build to production, with each step recorded.
  • Integrations: endpoints and credentials must be re-pointed after a refresh, otherwise test traffic can reach live systems.

Recovery of troubled projects

When a project goes off track, the first diagnostic step is usually an architectural review: how the solution was configured, how many custom objects exist, how environments are managed and whether the integration design is sound. From that picture you decide whether to repair, re-plan or restart the affected scope.

The articles under this tag cover those topics from the viewpoint of someone who has to run the system after the project ends.

Kalkulator ROI

Oblicz zwrot z inwestycji

WartoÅ?ci wejÅ?ciowe

€
€
€

Wyniki

Roczne oszczÄ?dnoÅ?ci
€ 0
Okres zwrotu
0 months
ROI
0%
MiesiÄ?czne oszczÄ?dnoÅ?ci
€ 0

Pobierz szczegóÅ?owy raport

Podaj swoje dane, aby otrzymaÄ? szczegóÅ?owy raport ROI.