Manufacturing in IFS Cloud covers the planning and execution of production: product structures, routings, shop orders, material availability, capacity and the posting of what was consumed and produced. This tag collects articles where those pieces meet a concrete business question, for example how a variant-heavy product should be modelled so that the customer order, not a growing catalogue of part numbers, drives the structure.

Where every production scenario starts

The product structure and the routing come first. A static bill of materials fits a product that is made the same way every time. Configure to Order fits a product where the customer chooses options and the structure is derived from those choices. The decision between the two affects how many part numbers you maintain, how sales and production exchange information and how stable your costing is after go-live.

Questions a consultant asks early

  • How much variety is real? A handful of options can be handled with variants of a static structure. Thousands of combinations usually cannot.
  • Who owns the rules? If sales picks options in a configurator, engineering has to own the logic behind it, not the individual order.
  • What does the shop floor see? The shop order should carry the materials and operations the planner needs, without manual editing at release.
  • How is cost built up? Material, operation and overhead cost should follow the structure the order actually used.

Typical implementation traps

One trap is carrying legacy part numbering into IFS Cloud unchanged, which produces duplicate structures and long maintenance lists. Another is designing routings for the ideal flow instead of the real one, so shop orders get corrected by hand after release. Fixing either after go-live means touching structures, planning parameters and reported cost history at the same time.

The articles under this tag come from implementation practice. They describe how the standard functionality is meant to be used, where the design decisions sit and what to settle with the business before configuration begins, so the production model you build matches how the plant actually works.

ROI Calculator

Calculate your return on investment

Input Values

€
€
€

Results

Annual Savings
€ 0
Payback Period
0 months
ROI
0%
Monthly Savings
€ 0

Get Detailed Report

Enter your details to receive a detailed ROI report.