Skip to main contentSkip to footer

Multi-Site

Multi-site operation in IFS Cloud means that several sites, each with its own stock, locations and often its own company, work in one system and exchange goods and orders. The main design decisions are about which processes are local and which are shared.

Moving goods between sites

  • Distribution orders handle the planned supply from one site to another, with the supplying site shipping and the receiving site getting the stock.
  • Shipment orders describe the physical move of stock and are used for transfers that need packing and transport documents.
  • Inter-site supply through purchase and customer orders is chosen where the sites are separate legal entities, since each side then needs its own financial documents.

Centralised purchasing

A purchasing organisation can place orders on behalf of several sites, which gives a single supplier relationship and shared conditions. The design must then say who owns supplier master data, how demand from each site is consolidated, and how received goods are split back to the ordering sites.

Questions for a workshop

Ask which sites share part numbers and which keep their own. Ask whether transfer prices are needed. Ask which site owns planning for a part that is stocked in several places. Answers to these decide the setup, and changing them after go-live affects reports, costing and inventory valuation.

The articles under this tag explain the shipment order, distribution orders and centralised purchasing, with the practical steps and the typical settings that cause problems.

Test the full loop with one real part before go-live: create the transfer, ship it from the supplying site, receive it at the other, and check stock, value and document trail on both sides. A transfer that works on paper but leaves in-transit stock unexplained will show up in the first month-end close.

ROI Calculator

Calculate your return on investment

Input Values

€
€
€

Results

Annual Savings
€ 0
Payback Period
0 months
ROI
0%
Monthly Savings
€ 0

Get Detailed Report

Enter your details to receive a detailed ROI report.