Skip to main contentSkip to footer

Quick Reports

Quick Reports are IFS Cloud's tool for running a prepared query on IFS data and getting the result as a list that can be filtered, exported and shared. They sit at the lightweight end of the reporting tools, and they are most often used for operational questions that need an answer today.

When a Quick Report is the right tool

A Quick Report fits when the question is stable, the data is in IFS, and the readers are IFS users. It is based on a query, so its author needs to know the views or entities involved, and it appears in the same place as other saved reports. It does not need a change to the application, which is why it is popular for update-safe solutions.

Where it stops

  • Heavy formatting or complex printed layouts belong with the report designer.
  • Dashboards combining many measures fit Lobbies better.
  • Analysis across several systems is a job for a BI platform fed from IFS data.

Practical advice

Name reports by the question they answer, give each one an owner, and review the list yearly. A library of unowned queries ages quickly, and after a few release updates nobody knows which ones still return correct results. Access to a report is controlled through Permission Sets, so check that a report with sensitive columns is not visible to more people than intended.

The articles under this tag put Quick Reports in the wider reporting toolbox and use manufacturing material consumption as an example of a question where a saved query answers what the standard pages show only partially.

Before building a new one, search the existing library. Finding that a colleague already saved a similar query is common, and extending it keeps the number of reports under control. When a report is no longer used, retire it, so that people searching the list find the current ones first.

ROI Calculator

Calculate your return on investment

Input Values

€
€
€

Results

Annual Savings
€ 0
Payback Period
0 months
ROI
0%
Monthly Savings
€ 0

Get Detailed Report

Enter your details to receive a detailed ROI report.