Skip to main contentSkip to footer

Implementer: Commercial Terms, Support and Host Requirements

Payment terms, support hours and response times, and host sizing by number of users and generated documents.

These are the standard terms. Anything agreed differently is written into the order. Payment terms Item Invoice Due Pilot (Standard €9,500, or €6,900 for the…

Read more

Implementer: Implementation Support for IFS Cloud

A self-hosted application that runs the IDK implementation templates as registers with gates, approvals and an audit trail.

Implementer runs an IFS Cloud implementation project from registers instead of documents. Risks, issues, change requests, CRIM objects, interfaces, test…

Read more

SCM Exception Scan vs Automation Pack for IFS Cloud

SCM Exception Scan (EUR900) or Automation Pack (EUR1,800+EUR350/mo)? Compare price, deliverables and next steps for IFS Cloud purchasing monitoring.

IFS Cloud · Purchasing & Inventory exception monitoring See your exceptions first, or put them under control today? SCM Exception Scan and SCM Automation Pack…

Read more

SCM Automation Pack for IFS Cloud | Nothing Installed in IFS

Daily alerts for IFS Cloud purchasing: unconfirmed POs, late deliveries, stock below minimum. Read-only OData, nothing installed. EUR 1,800 + EUR 350/mo.

IFS Cloud · Purchasing & Inventory exception monitoring SCM Automation Pack A monitoring service that watches your purchasing and inventory exceptions in IFS…

Read more

SCM Exception Scan for IFS Cloud

A five-day, read-only scan that shows the purchasing exceptions already sitting in your IFS Cloud. No emails, no trace in IFS.

IFS Cloud · Purchasing & Inventory SCM Exception Scan A five-day, read-only scan that shows the exceptions already sitting in your own IFS Cloud data:…

Read more
SCM Exception Scan vs Automation Pack for IFS Cloud

IFS Cloud · Purchasing & Inventory exception monitoring

See your exceptions first, or put them under control today?

SCM Exception Scan and SCM Automation Pack read the same purchasing and inventory exceptions in your IFS Cloud data, over the same read-only OData connection. One is a five-day look at your own data, priced once. The other is the ongoing service that keeps acting on what that look would find, every day. This page lines them up side by side so you can pick the one that matches where you are right now.

Key takeaways

  • Both services read your IFS Cloud over OData with a read-only account; neither installs anything in it.
  • The Scan is a five-business-day, €900 fixed-price look at your own exceptions, ending in a report and a 30-minute walkthrough.
  • The Pack is the ongoing service: three Wave 1 rules, maintenance, verification before every IFS release and a quarterly value report, from €1,800 implementation plus €350 or €590 a month.
  • Move from the Scan to the Pack within 90 days and the €900 fee is credited in full against the €1,800 implementation. It does not stack with the first-client referral discount.
  • Don’t continue after the Scan, and the container is simply removed. Nothing stays behind.

1.The one-sentence version

The SCM Exception Scan is the same observation week that opens the SCM Automation Pack, sold on its own. It doesn’t need any new code: the Scan runs the identical engine in dry-run mode, on a read-only account, so what you see in the Scan report is exactly what the Pack would be watching every day if you kept it switched on.

2.Compare them side by side

  SCM Exception Scan SCM Automation Pack
What it is A one-off, five-business-day scan of your purchasing and inventory exceptions. Read-only, observation mode only: nothing is sent to anyone. An ongoing service: three Wave 1 rules running against your live IFS Cloud data, maintained and verified before every IFS release.
Price €900, fixed, one-off. €1,800 implementation once, then €350/mo (Core) or €590/mo (Plus).
What you get at the end An exception report plus a 30-minute walkthrough with your team. A quarterly value report, one deduplicated morning digest per owner, and tuning on request under Plus.
If you don’t go further Your integration account is revoked and the container is removed, following the documented decommissioning procedure. Nothing stays behind. Not applicable. This is already the ongoing service.
If you do go further The €900 fee is credited in full against the €1,800 implementation, within 90 days. It does not stack with the first-client referral discount. This is the entry point itself. Further rules beyond the three are built on request (€450 each) or included, up to eight, under Plus.
When to pick which You want to see your own data before committing to anything ongoing, with zero further obligation. You already know you want ongoing coverage and want the observation week, the rules and the reporting running now.

3.Which one should you start with

Start with the €900 scan

Five business days, read-only, zero commitment beyond the fee itself. You get a report of what’s already sitting in your own IFS Cloud data before you decide on anything ongoing.

Start with the €900 scan

Go straight to the Automation Pack

If you already know you want daily coverage, three rules, checks before every IFS release and a quarterly report, skip the standalone scan and start the observation week as part of implementation.

See the SCM Automation Pack

4.Frequently asked questions

Can I start with the Scan and not buy the Pack?

Yes. The Scan is a complete, five-business-day engagement on its own: read-only, observation mode, ending in a report and a 30-minute walkthrough. If you decide not to continue, your integration account is revoked and the container is removed following the documented decommissioning procedure. Nothing stays behind in your IFS or in your infrastructure.

Does the Scan fee really apply against the Pack?

Yes, in full. If you move to the SCM Automation Pack within 90 days of the Scan, the €900 fee is credited against the €1,800 implementation charge, so the Scan effectively costs nothing extra if you continue.

Can I combine the Scan credit with the first-client referral discount?

No. The two concessions do not stack: you pick either the Scan fee credited against implementation or the referral discount on implementation, never both. This keeps the reason the implementation fee exists in the first place, an implementation at €0 would stop separating a client who is genuinely piloting from one who just wants to try for free.

Which one should I start with?

Start with the Scan if you haven’t seen your own exceptions yet and want zero ongoing obligation while you decide. Start directly with the Pack if you already know you want ongoing monitoring and want the observation week, the rules and the quarterly reporting running as soon as possible.

5.About the author

18 years of hands-on IFS practice (Apps 7.5–10 and Cloud). IFS Certified Associate Consultant. PRINCE2® 7. Hands-on across IFS Cloud integration (OData, read-only) and the full SCM chain: Purchasing, Requisitions, Inventory, Sales, Invoicing. You talk to the consultant who builds both of these services, not a sales layer.

Selected clients: Fugro · LGC · BVI Medical · Betafence (PRÆSIDIAD) · Barlinek · NGK Ceramics · Newag · Oleofarm.

IFS is a registered trademark of IFS AB; this practice is not affiliated with IFS AB.

See your own exceptions, or start monitoring today

Read the table above once more, then pick the path that matches where you are. Both start on read-only access, and both start with a conversation about your own data, not a generic pitch.

Start with the €900 scan See the SCM Automation Pack

ROI Calculator

Calculate your return on investment

Input Values

€
€
€

Results

Annual Savings
€ 0
Payback Period
0 months
ROI
0%
Monthly Savings
€ 0

Get Detailed Report

Enter your details to receive a detailed ROI report.