Implementer · IFS Cloud implementation management
Keep the IFS phase plan and know who confirmed each step, on what evidence
Key takeaways
- The IFS Cloud implementation methodology (Initiate Project, Confirm Prototype, Establish Solution, Implement Solution, Go Live) defines the phases and milestones; Implementer is built on it and keeps the facts behind each milestone as register rows, each with its history.
- In a plan kept in files, a milestone is accepted by a signature on a document; in Implementer, an acceptance is tied to the version of a record and to evidence (five gates and 61 items in a new implementation).
- Links between records do the cross-checking: a risk that materialises creates a linked issue, and a blocked action shows its reason.
- The same register serves every project mode, and the 24 IDK templates are generated from it as a secondary view.
- A small, single-site project with an experienced team can run well on documents, and the comparison table below says where that stops being true.
An IFS Cloud project plan built on the IFS phases tells you which deliverables are due at each milestone, but not whether the facts behind those deliverables are current, who confirmed them and what changed since. Implementer is an independent application, not an IFS product, that is built on the IFS methodology and keeps its phase structure. What it changes is where the source of truth sits: in a register, not in a document. This article describes both approaches, what each does well and when a document-based project is the better choice.
1.Where does the source of truth sit: in a document or in a register?
In a document-based project the source of truth is the document: the project plan, the risk log, the CRIM list or the test report is a file, and the file is the record. The IFS methodology, historically known as IFS AIM, organises that documentation into phases (Initiate Project, Confirm Prototype, Establish Solution, Implement Solution, Go Live) and assigns milestones and documentation artefacts to the stages. That gives the team an order of work and a shared vocabulary. Both approaches in this article follow the IFS phases; they differ only in where the facts are kept.
In a register-based project the source of truth is a row. A risk, an issue, a change request, a CRIM item, an interface, a test cycle, a migration object and an approval are each a record with an owner, a status and a history. The documents still exist: the 24 templates of the Implementation Docs Kit are generated from the registers on demand as versioned files with a hash, so a document is a secondary view of the data and never the place where the data lives.
The practical difference shows up at the moment two copies disagree. A document has no field that says which copy is current; a register row has one version, and its history lists the earlier ones. Eight project problems follow from this single cause (readiness, scope, data migration, testing, accountability, updates, knowledge and reporting) and are described on the problems page of Implementer; the launch article Implementer: run IFS Cloud projects from registers covers the product as a whole.
2.How do milestones and artefacts compare with gates, checklists and named approvals?
In a plan kept in files, the acceptance of a milestone is a signature on a document; in Implementer, the acceptance is tied to the version of a record and to evidence. The two answer different questions, and a project can use both.
What a milestone and its artefacts tell you
A milestone fixes a point in the plan and lists the documents expected at it. Implementer keeps this phase logic, because the plan of an IFS Cloud project still needs phases, milestones and expected deliverables.
What a gate in Implementer adds
A gate in Implementer is a checklist, and each item is closed only with evidence attached and an acceptance by a named person. A new implementation has five gates and 61 items, listed in Qualification Gate Checklists (IDK-08). The go-live readiness review has 42 criteria in nine groups, and the final decision is taken by named people, as described in the Go-Live Readiness Decision (IDK-21).
An approval is tied to the hash of the exact version of the content that was approved, so a later edit cannot silently change what a person agreed to. Approval rules support delegation.
3.How are dependencies between records and the audit trail handled?
Documents hold dependencies as references in prose, so a risk in the log and the issue it later became are two paragraphs in two files that someone has to connect. In Implementer the connection is a rule between records.
- Risk to issue. When a risk materialises, Implementer creates a linked issue, so the history of the risk continues in the issue. The two registers are described in Risk Register and Issue Log (IDK-04).
- Change with a full trail. Every change to a record is stored with who changed it, when and through which channel: the UI, the API, the AI assistant or an import. The change procedure itself is in Change Requests and Change Control (IDK-07).
- Blocked actions explain themselves. When a rule blocks an action, Implementer shows the reason for the block.
- CRIM objects as records. CRIM items are kept as rows with an owner and a status, as in the CRIM Log (IDK-10).
An audit then starts from the trail of each record instead of a search through mailboxes. Implementer reads IFS Cloud over OData with a read-only account and never writes to it, so the trail describes the project and does not touch the system under audit. The assistant has the same limit on the project side: AI only prepares drafts, a person approves, and AI does not approve anything or change a status.
4.Which project situations does the same register cover?
Implementer has three modes of the same register, because a first implementation, a second site and a running system need different things from it.
- New implementation. The five gates with 61 checklist items follow the project from start to go-live. For the scope work that feeds the first gates, see fit-to-standard workshops in IFS Cloud.
- Rollout. What is common to all sites stays one set of records, and the local differences of each branch are kept apart from it.
- BAU and Evergreen. Each IFS update is a project with its own regression pack, and a drift check against IFS reads from IFS and never writes to it. The planning side is in the Update Strategy for Evergreen (IDK-23), and the problem it addresses in process drift after go-live.
A project that has already stalled is the subject of rescuing a stalled IFS Cloud implementation.
5.When is each approach the better one?
Documents are the better tool for a project run by a small team on one site, because the cost of a register is not repaid when nobody needs to prove a decision to anyone else. Registers pay back as the number of people, sites, environments and updates grows.
| Situation | Documents as the source of truth | Registers as the source of truth |
|---|---|---|
| One site, small team, single implementation | Sufficient. Few readers, few conflicting copies. | Possible, with set-up effort that the project may not need. |
| Several owners per decision, steering group, audit | Approvals and versions are reconstructed from files and mail when someone asks. | Named acceptances tied to a version hash, with a full trail. |
| Rollout to further sites | The previous site’s folder is copied and edited, and the copies are then maintained separately. | Common part kept once, local differences recorded separately. |
| Go-live decision | A signed readiness document. | 42 criteria in nine groups with evidence and named decision-makers. |
| Evergreen updates in BAU | A plan and a test list prepared as documents for each update. | Each update is a project with a regression pack and a read-only drift check. |
Both approaches can sit side by side, because the IDK templates are available as plain documents in the kit index for teams that choose to stay with files.
6.Frequently asked questions
Does Implementer replace the IFS implementation methodology?
No. Implementer is built on the IFS methodology, whose phases are Initiate Project, Confirm Prototype, Establish Solution, Implement Solution and Go Live. It changes where the facts are stored: each one is a register row with its history, not a paragraph in a file.
What is the difference between phase milestones and gates in Implementer?
In a plan kept in files, a milestone is accepted by a signature on a document. A gate in Implementer is a checklist whose items are closed only with evidence and the acceptance of a named person; a new implementation has five gates and 61 items, each closed on that basis.
Do we still use the IDK templates if we run the project from registers?
Yes. The 24 templates of the Implementation Docs Kit are generated from the registers on demand as versioned files with a hash, for example for a steering group or an auditor. The document is a secondary view of the register, generated from its current rows, and the hash identifies the exact version that was issued.
Can Implementer run a rollout or an Evergreen update cycle, not only a new implementation?
Yes. Implementer runs rollout and Evergreen updates on the same register as a new implementation. In a rollout, the part common to all sites is kept separate from local differences. In BAU, each IFS update cycle is a project with a regression pack and a drift check against IFS that only reads from IFS.
When is a document-based approach enough?
A document-based approach is enough for a small project with one site and a small team that makes the decisions, because few readers means few conflicting copies and no one has to prove an approval to a third party. Registers start to pay back with several owners, a steering group, an audit, additional sites or recurring Evergreen updates.
7.About the author
Dariusz Myśliwiec is an independent IFS Cloud consultant with 18 years on IFS, and the person who builds Implementer. You talk to the consultant who builds it, not a sales layer. The demo runs on fictitious data without a connection to a real IFS and takes about 15 minutes, along one path.
Clients of the IFS practice: Fugro · LGC · BVI Medical · Betafence (PRÆSIDIAD) · Barlinek · NGK Ceramics · Newag · Oleofarm · RADPOL · ATLAS.
Independent product, not an IFS product or document. IFS is a registered trademark of IFS AB; this practice is not affiliated with IFS AB.
Talk through your project in 30 minutes
Bring your current plan and the IFS phase you are in, and we will look at which records would carry it. Prefer to see it first? The demo shows one change from request to decision. No pitch: you talk to the consultant who builds it. More about the product is on the Implementer page.